Open Access
Issue |
MATEC Web Conf.
Volume 95, 2017
2016 the 3rd International Conference on Mechatronics and Mechanical Engineering (ICMME 2016)
|
|
---|---|---|
Article Number | 17007 | |
Number of page(s) | 4 | |
Section | Civil and Architectural Engineering | |
DOI | https://doi.org/10.1051/matecconf/20179517007 | |
Published online | 09 February 2017 |
- M. R. Abdul Kadir, W.P. Lee, M.S. Jaffar, S.M. Sapuan, A.A.A. Ali, Construction Performance Comparison between Conventional and Industrialized Building Systems in Malaysia, Structural Survey, 24, 5, pp. 412–424 (2006). [CrossRef] [Google Scholar]
- N.A. Ahmad Bari, R. Yussuff, N. Ismail, A. Jaapar, N. Ahmad, Factors Influencing the Construction Cost of Industrialised Building System (IBS) Projects, Procedia-social and Behavioral Science, Elsevier, 35, pp. 689–696 (2012). [Google Scholar]
- A. Tay Eng Mian, Industrialised Building System Formation Scheduling for Public Buildings, Master Thesis, University of Technology Malaysia Publishing (2006). [Google Scholar]
- A. Naderpour, M. Mofid, J. Majrouhi Sardrood, State-of-the-Art Review on Project’s Scheduling Network and Fuzzy Critical Path Method Calculation (FCPM), The Second International Conference of Science, Engineering and Technology, Istanbul, Turkey (2015). [Google Scholar]
- S. Rao Rachakondra, Fuzzy logic integration into construction management planning, Master Thesis, Chapter 3, Polytechnic University of Catalonia Publishing (2015). [Google Scholar]
- A. Ozta, O. Oktem, in: Evolutionary A CPM-Based Scheduling Method for Construction Projects with Fuzzy Sets and Fuzzy Operations, 56, pp. 2–9 (2014). [Google Scholar]
- F. Choobineh, H. Li, in: An index for ordering fuzzy numbers, Journal of Fuzzy Sets and Systems, 5, pp. 1–19 (1985). [Google Scholar]
- A. Naderpour, M. Mofid, in: Improving construction management of an educational centre by applying earned value technique. Procedia engineering, 14, pp. 1945–1952 (2011). [CrossRef] [Google Scholar]
- C.H. Cheng, in: A new approach for ranking fuzzy numbers by distance method, Journal of Fuzzy Sets and Systems, 95, pp. 307–317 (1998). [Google Scholar]
- C. Chen, H. Tang, in: Ranking nonnormal pnorm Trapezodial fuzzy numbers with integral value, Journal of Computers and Mathematics with Applications, 56, pp. 2340–2346 (2008). [CrossRef] [Google Scholar]
- S. Abbasbandy, B. Asady, in: Ranking of fuzzy numbers by sign distance, Journal of Information Science, 176, pp. 2405–2416 (2006). [CrossRef] [Google Scholar]
- S. Sathish, K. Ganessan, in: A simple approach to fuzzy critical path analysis in project networks, International Journal of Scientific & Engineering Research, 2, pp. 1–6 (2011). [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.