Presenting a Model Based on Fuzzy Application to Optimize the Time of IBS Projects in Gas Refineries
1 Ph.D. Student, Faculty of Engineering, Islamic Azad University, Central Tehran Branch, Iran
2 Head of Structural Engineering, Management of Coordination and Production Supervision, National Iranian Gas Company, Iran
3 Assistant Professor, Faculty of Engineering, Islamic Azad University, Central Tehran Branch, Iran
4 Professor, Department of Civil Engineering, Sharif University of Technology, Iran
Nowadays, the construction industry has started to embrace IBS as a method of attaining better construction quality and productivity and reducing risks related to occupational safety and health. The built of pre-fabricated component in factories reduces many problems related to lack of purposing uncertainty in scheduling calculation and time management of projects. In the case of using IBS method for managing time in projects, former studies such as Allan Tay’s research, indicates that this method can save up at least 29% of overall completion period versus the conventional method. But beside mentioned advantages of this technical method, the projects could be optimized more and more in scheduling calculations. This issue is critical in gas refineries, since special parameters such as risk of spreading poison H2S gas and mandatory of performing projects in short time period events such as maintenance overhauls demands to perform projects in optimum time. Custom scheduling calculation of project planning uses the Critical Path Method (CPM) as a tool for Planning Project’s activities. The researches of this paper’s authors indicated that Fuzzy Critical Path Method (FCPM) is the best technique to manage the uncertainty in project scheduling and can save up the construction project’s time versus the custom methods. This paper aims to present a model based on fuzzy application in CPM calculations to optimize the time of Industrial Building System.
© The Authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.