Last planner system in construction
Warsaw University of Technology, Civil Engineering Faculty, Armii Ludowej 16, 00-637 Warsaw, Poland
* Corresponding author: j.roslon@il.pw.edu.pl
The paper presents the set of information on the particular measures of the Last Planner System (LPS) of Production Control. Then, the system as a whole is described and the profits for all relevant parties of investment process arising from adopting the Last Planner System are shown. Paper include comparison between LPS and traditional project control model.
© The Authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.