Open Access
Issue |
MATEC Web Conf.
Volume 219, 2018
2nd Baltic Conference for Students and Young Researchers (BalCon 2018)
|
|
---|---|---|
Article Number | 04003 | |
Number of page(s) | 8 | |
Section | Construction Management and Technology | |
DOI | https://doi.org/10.1051/matecconf/201821904003 | |
Published online | 29 October 2018 |
- B. Grzyl, M. Apollo, Umowa o roboty budowlane w aspekcie podziału ryzyka stron. Inżynieria Morska i Geotechnika 6, 838-843 (2015) [Google Scholar]
- B. Grzyl, E. Maliszewska-Urbańska, A. Siemaszko, Safety of investment process parties in the aspect of construction work contract. Journal of Science of the Gen. Tadeusz Kosciuszko Military Academy of Land Forces 49/4, 208-215 (2017) [CrossRef] [Google Scholar]
- B. Dao, S. Kermanshachi, J. Shane, S. Anderson, E. Hare, Exploring and assessing project complexity. Journal of Construction Engineering and Management, 10.1061/(ASCE)CO.1943-7862.0001275, 04016126 (2017) [CrossRef] [Google Scholar]
- H. Anysz, A. Foremny, J. Kulejewski, Estimating potential losses of the client in public procurement in case of collusion utilizing a MLP neural networks, Technical Transactions 111/1–B, 105–118, DOI:10.13140/2.1.2409.6321 (2014) [Google Scholar]
- S. Biruk, P. Jaśkowski, A. Czarnigowska, Modeling Contractor’s Bidding Decisions, Procedia Engineering 182, 91-98, DOI:10.1016/j.proeng.2017.03.125 (2017) [CrossRef] [Google Scholar]
- S. Dubas, J. Pasławski, The concept of improving communication in BIM during transfer to operation phase on the Polish market, Procedia Engineering 208, 14-19, DOI:10.1016/j.proeng.2017.11.015 (2017) [CrossRef] [Google Scholar]
- H. Anysz, Wykorzystanie sztucznych sieci neuronowych do oceny możliwości wystąpienia opóźnień w realizacji kontraktów budowlanych. Rozprawa doktorska, Wydział Inżynierii Lądowej PW, Oficyna Wydawnicza Politechniki Warszawskiej, DOI:10.13140/RG.2.2.14129.68960 (2017) [Google Scholar]
- H. Anysz, The profit as in-company evaluation of the construction site effectiveness. MATEC Web of Conferences 117, 1-6, DOI:10.1051/matecconf/201711700009 (2017) [CrossRef] [EDP Sciences] [Google Scholar]
- H. Anysz, Założenia systemu rozliczeń TKW + M (techniczny koszt wytworzenia plus marża), Przegląd Budowlany 1 (2018) [Google Scholar]
- A. Dziadosz, O. Kapliński, A. Tomczyk, M. Rejment, Analiza i ocena ryzyka finansowego w przedsięwzięciu budowlanym, Materiały Budowlanej 8, 112-113, DOI:10.15199/33.2016.08.34 (2016) [Google Scholar]
- J. Kulejewski, Zarządzanie projektem według PMBoK (cz. 1). Przegląd Budowlany 80/4, 47-53 (2009) [Google Scholar]
- M. Banach, R. Marcinkowski, Harmonogramowanie robót budowlanych z wykorzystaniem przedmiarów dodatkowych w kosztorysowaniu, Materiały Budowlane 6, 6-7, DOI:10.15199/33.2016.06.02 (2016) [Google Scholar]
- M. Rogalska, Z. Hejducki, Time coupling methods construction scheduling and time/cost optimization, Wrocław: Oficyna Wydawnicza Politechniki Wrocławskiej (2011) [Google Scholar]
- M. Krzemiński, The scheduling of construction work under the assumption of brigade multitasking, Procedia Engineering 208, 63-68, DOI:10.1016/j.proeng.2017.11.021 (2017) [CrossRef] [Google Scholar]
- E. Plebankiewicz, J. Malara, The algorithm for the evaluation of construction workers’ labour productivity, Technical Transactions, Y. 114/6, 153-161, DOI:10.4467/2353737XCT.17.095.6571 (2017) [Google Scholar]
- E. Radziszewska-Zielina, A. Sobotka, E. Plebankiewicz, K. Zima, Wstępna identyfikacja i ocena parametrów wpływających na wydajność układu operator-maszyna do robót ziemnych, Budownictwo i Architektura 12(1), 53-60 (60) [Google Scholar]
- N. Ibadov, Selection of Construction Project Taking into Account Technological and Organizational Risk, Acta Physica Polonica A 132, 974-977, DOI:10.12693/APhysPolA.132.974 (2017) [CrossRef] [Google Scholar]
- M. Juszczyk, A. Leśniak, K. Zima, Selected issues of bills of quantities in construction works in Poland, Journal of Science of the Gen. Tadeusz Kosciuszko Military Academy of Land Forces 49, 1(183), 189-200 (200) [Google Scholar]
- K. Jaworski, Metodologia Projektowania Realizacji Budowy, Wydawnictwo Naukowe PWN, Warsaw (2009) [Google Scholar]
- Katalog Nakładów Rzeczowych 2-02, tab. 0218, Wacetob (1997) [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.