Issue |
MATEC Web Conf.
Volume 219, 2018
2nd Baltic Conference for Students and Young Researchers (BalCon 2018)
|
|
---|---|---|
Article Number | 04003 | |
Number of page(s) | 8 | |
Section | Construction Management and Technology | |
DOI | https://doi.org/10.1051/matecconf/201821904003 | |
Published online | 29 October 2018 |
The Conjugated Triangle Method CTM of the detection of inconsistent bids in the construction industry
Warsaw University of Technology, Faculty of Civil Engineering, Institute of Building Engineering, Division of Production Engineering and Construction Management,
Al. Armii Ludowej 16,
00-637
Warsaw, Poland
*
Corresponding author: h.anysz@il.pw.edu.pl
The existing system of bids evaluation in the construction industry does not bring the clients the certainty if all placed bids comprise real, achievable prices. Especially in the road construction sector, where the earthworks create significant part of the works, comparing e.g. the price of 1 km of roads often gives misleading results. The paper comprises the complete proposal to modify the scope of information provided by offerors in the public procurements (in the construction industry) allowing the clients to determine easily if the contractors have placed the consistent offers i.e. if the bid prices are not too high and if the lowest bid price is not a dumping price. The Conjugated Triangle Method (CTM) of inconsistent bid detection in construction industry is based on the three inter-related parameters: means of production, time of works, on the value of works. Regardless of the offered price it should match the other two parameters.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.