Open Access
Issue |
MATEC Web Conf.
Volume 219, 2018
2nd Baltic Conference for Students and Young Researchers (BalCon 2018)
|
|
---|---|---|
Article Number | 04002 | |
Number of page(s) | 8 | |
Section | Construction Management and Technology | |
DOI | https://doi.org/10.1051/matecconf/201821904002 | |
Published online | 29 October 2018 |
- H. Anysz, A. Foremny, J. Kulejewski, Estimating potential losses of the client in public procurement in case of collusion utilizing a MLP neural networks, Technical Transactions 111/1–B, 105–118, DOI:10.13140/2.1.2409.6321 (2014) [Google Scholar]
- Y.C.A. Capobianco, Ex Officio Cartel Investigations And The Use Of Screens to Detect Cartels, OECD (2013). [Google Scholar]
- Urząd Ochrony Konkurencji i Konsumentów, Zmowy przetargowe“ (2017) [Google Scholar]
- J.D. Zona, Bid-rigging and the Competitive Bidding Process: Theory and Evidence, Ph.D. Dissertation, State University (1986) [Google Scholar]
- R.H. Porter, J.D. Zona, Detection of Bid Rigging in Procurement Auctions, Journal of Political Economy 101/ 3, 518–538 (1993) [CrossRef] [Google Scholar]
- A. Leśniak, Classification of the Bid/No Bid Criteria – Factor Analysis, Archives of Civil Engineering 61/4, 79-88, DOI:10.1515/ace-2015-0037 (2015) [Google Scholar]
- Instytut Badawczy Dróg i Mostów, Instrukcja oceny efektywności ekonomicznej przedsięwzięć drogowych i mostowych dla dróg wojewódzkich, (2008) [Google Scholar]
- J. Harrington, Behavioral screening and the detection of cartels, European Competition Law Annual (2006) [Google Scholar]
- OECD, OECD recommendation of the council on fighting bid rigging in public procurement (2012) [Google Scholar]
- A.S. Bageis, C. Fortune, Factors affecting the bid/no bid decision in the Saudi Arabian construction contractors, Construction Management and Economics 27/1, 53–71 (2009) [CrossRef] [Google Scholar]
- M.S. El-Mashaleh, Decision to bid or not to bid: a data envelopment analysis approach, Canadian Journal of Civil Engineering (2010) [Google Scholar]
- A. Enshassi, S. Mohamed, A. El Karriri, Factors affecting the bid/no bid decision in the Palestinian construction industry, Journal of Financial Management of Property and Construction 15/2, 118–142 (2010) [CrossRef] [Google Scholar]
- A. Leśniak, E. Plebankiewicz, Modeling the Decision-Making Process Concerning Participation in Construction Bidding, Journal of Management in Engineering 31/2, 4014032, DOI:10.1061/(ASCE)ME.1943-5479.0000237 (2015) [Google Scholar]
- S. Biruk, P. Jaśkowski, A. Czarnigowska, Modeling Contractor’s Bidding Decisions, Procedia Engineering 182, 91–98, DOI:10.1016/j.proeng.2017.03.125 (2017) [CrossRef] [Google Scholar]
- Centrum edukacji i nauczania, [Online:] http://www.nowowydane.pl/cen [Access: 15-Jan-2018] [Google Scholar]
- D.T. Larose, C.D. Larose, Discovering Knowledge in Data, Willey IEEE, ISBN978-81-265-5834-6 (2016) [Google Scholar]
- T. Morzy, Eksploracja danych. Metody i algorytmy, PWN (2013) [Google Scholar]
- M. Pęczkowski, M. Lasek, Analiza asocjacji i reguły asocjacyjne w badaniu wyborów zajęć dydaktycznych dokonywanych przez studentów. Zastosowanie algorytmu Apriori, Ekonomia. Rynek. Gospodarka. Społeczeństwo (2013) [Google Scholar]
- Internetowy podręcznik statystyki, [Online:] https://www.statsoft.pl/textbook/stathome.html. [Access: 10-Jan-2018] [Google Scholar]
- H. Anysz, Założenia systemu rozliczeń TKW + M (techniczny koszt wytworzenia plus marża), Przegląd Budowlany 1 (2018) [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.