The problem of choosing risk management methodology at the example of railway construction.
WUT, The Faculty of Civil Engineering, Institute of Building Engineering, Division of Production Engineering and Construction Management, al. Armii Ludowej 16, 00-637 Warsaw, Poland
* Corresponding author: k.kaczorek@il.pw.edu.pl
One of the most expensive projects in the construction industry are railway projects. High costs and specificity of implementation involve high risks throughout the investment and construction process. Over the years, project management methodologies have been developed that facilitate, among other things, the management of risk factors This article reviews the recommendations for risk management in each methodology. In addition, their usefulness have been evaluated in railway construction.
© The Authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.