Open Access
Issue |
MATEC Web Conf.
Volume 103, 2017
International Symposium on Civil and Environmental Engineering 2016 (ISCEE 2016)
|
|
---|---|---|
Article Number | 03002 | |
Number of page(s) | 6 | |
Section | Sustainable Construction, Management and Green Building | |
DOI | https://doi.org/10.1051/matecconf/201710303002 | |
Published online | 05 April 2017 |
- M.E. Abd El-Razek, H.A. Bassioni and A.M. Mobarak, Causes of delay in building construction projects in Egypt, J. Constr. Eng. and Manage., 134(11), 831–841, (2008) [CrossRef] [Google Scholar]
- W.E. Alaghbari, R.A. Kadir, M.A. Salim and Ernawati, The significant factors causing delay of building construction projects in Malaysia, Eng., Constr. Architect. Manage., 14(2), 192–206, (2007). [Google Scholar]
- A. Dubois and L. Gadde, The construction industry as a loosely couple system: Implications for productivity and innovation, Constr. Manage. and Econ., 20(7), 621–631, (2002) [CrossRef] [Google Scholar]
- D.W. Chan and M.M. Kumaraswamy, A comparative study of causes of time overruns in Hong Kong construction projects, Int. J. Project Manage., 15(1), 55–63, (1997). [CrossRef] [Google Scholar]
- X. Fei, and T.H. Khan, Identifying Attributes for Expert Construction Project Managers in the Context of China, Int. J. Asian Social Sci., 5(7), 407–418, (2015). [CrossRef] [Google Scholar]
- J.J. Chen, The characteristics and current status of China’s construction industry, Constr. Manage. Econ., 16(6), 711–719, (1998) [CrossRef] [Google Scholar]
- P.F. Kaming, P.O. Olomolaiye, G.D. Holt and F.C. Harris, Factors influencing construction time and cost overruns on high-rise projects in Indonesia, Constr. Manage. Econ., 15(1), 83–94. (1997). [Google Scholar]
- A.H. Memon and I. Abdul Rahman, SEM-PLS Analysis of inhibiting factors of cost performance for large construction projects in Malaysia: Perspective of clients and consultants, The Scientific World J., 165–158, (2014) [Google Scholar]
- Ministry of Public works and Highways, Synopsis, Retrieved from: http://www.mpwhye.net/en/website/ministry/detail.php?ID=1454&lang=en (2016). [Google Scholar]
- B. Sultan, impediments to the construction industry development of Yemen, J. of Sci. Tech., 18, (2013). [Google Scholar]
- B.M. Sultan, The construction industry in Yemen: Towards economic sustainability, PhD Thesis, Queensland University of Technology, Australia, (2005) [Google Scholar]
- B.M. Sultan and S.L. Kajewski, The Yemen construction industry: Readying the industry for the successful implementation of sustainability, Queensland University of Technology, Australia, (2003) [Google Scholar]
- B. Sultan and W.E. Alaghbari, Incompetent construction technologies and resources in the construction industry of Yemen, KICEM J. Constr. Eng. Project Manage., 19(27), 2233–9582, (2014) [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.