Issue |
MATEC Web Conf.
Volume 103, 2017
International Symposium on Civil and Environmental Engineering 2016 (ISCEE 2016)
|
|
---|---|---|
Article Number | 03004 | |
Number of page(s) | 8 | |
Section | Sustainable Construction, Management and Green Building | |
DOI | https://doi.org/10.1051/matecconf/201710303004 | |
Published online | 05 April 2017 |
The Significance of Coordination for Industrialised Building System (IBS) Precast Concrete in Construction Industry
Faculty of Architecture, Planning and Surveying, Universiti Teknologi MARA, 94300, Kota Samarahan, Sarawak
* Corresponding author: mohd_khairul135@sarawak.uitm.edu.my
IBS precast concrete is construction system which is meant to improve the conventional construction process. However IBS precast concrete projects are suffering from serious problems such as cost overrun, delays and less quality of the end product. The absence of coordination is perceived as the reason for this issue. The purpose of this paper is to review the significance of coordination for IBS precast concrete in the construction industry. It if found that the fragmentation which occurs in the construction industry requires continuity of coordination due to the construction activities are intertwined in nature. Coordination is designated to assist stakeholders in completing and complementing each other with the paramount focus of achieving the objective. Proper coordination is required in delivering the desired construction product at the ideal time, cost and quality. As for the findings, the significance of coordination for IBS precast concrete can be seen through the precast concrete construction phases which consist of planning; design; manufacturing; transportation and installation/construction. These phases are meant to complement construction process with the purpose to reduce issues of fragmentation and enhance IBS precast concrete project delivery.
© The Authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.