Failure factors of Makkah’s mega construction projects: qualitative study
1
Department of Building and Construction Engineering, Faculty of Civil and Environmental Engineering, Universiti Tun Hussein Onn Malaysia, 86400 Parit Raja, Batu Pahat, Johor, Malaysia
3
Saudi Arabian Baytur Construction Co., P.O.Box.17606, JODP Phase II, MAKKAH K.S.A.
* Corresponding author: df080116@gmail.com
Makkah city in Saudi Arabia is the holiest place for all Muslims across the world due to the presence of Masjid Al-Haram where the “KAABA” is located. In the holy city of Makkah, mega construction projects are currently under construction to accommodate the increased numbers of pilgrims. These mega projects faced many impediments and challenges to be completed successfully. Hence, this paper presents an investigative study on failure factors of mega Makkah construction projects, particularly from the site management viewpoint. The insight issues are based on interview with senior manager having 15 years of working experiences in handling mega construction projects. The interview was carried out on open-ended mode where ample time was given to the respondent to express his experienced in handling Saudi’s construction projects. This study uncovered that 50 % of project failure is due to contractor, 30% is due to client/PMC (Project Management Consultant), 15% is due to supervision consultant and 5% is due external factors. It also identified 58 failure factors and clustered in 4 groups in which the group are Client Instigated Factors with 17 failure factors, Contractor Instigated Factors with 27 failure factors, Consultant Instigated Factors with 10 failure factors and External Instigated Factors with 4 failure factors. The findings are helpful for construction community as well as to researchers to understand the insightful issues engulfing construction projects in Makkah city.
© The Authors, published by EDP Sciences, 2018
This is an open access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.