Open Access
Issue
MATEC Web Conf.
Volume 66, 2016
The 4th International Building Control Conference 2016 (IBCC 2016)
Article Number 00079
Number of page(s) 6
DOI https://doi.org/10.1051/matecconf/20166600079
Published online 13 July 2016
  1. D. M. Gann and A. J. Salter, “Innovation in project-based, service-enhanced firms: the construction of complex products and systems,” Research policy, vol. 29, pp. 955–972, 2000. [Google Scholar]
  2. S. A. Assaf and S. Al-Hejji, “Causes of delay in large construction projects,” International journal of project management, vol. 24, pp. 349–357, 2006. [Google Scholar]
  3. A. Razak Bin M. H. Ibrahim Roy, Z. Ahmed, and G. Imtiaz, “An investigation of the status of the Malaysian construction industry,” Benchmarking: An International Journal, vol. 17, pp. 294–308, 2010. [CrossRef] [Google Scholar]
  4. M. Harvey, “Privatization, fragmentation and inflexible flexibilization in the UK construction industry,” Building chaos: An international comparison of deregulation in the construction industry, pp. 188–209, 2003. [Google Scholar]
  5. W. J. O’brien, “Construction supply-chain management: a vision for advanced coordination, costing, and control,” in NSF Berkeley-Stanford Construction Research Workshop, Stanford, California, 1999. [Google Scholar]
  6. X. Xue, Y. Wang, Q. Shen, and X. Yu, “Coordination mechanisms for construction supply chain management in the Internet environment,“ International Journal of project management, vol. 25, pp. 150–157, 2007. [Google Scholar]
  7. A. Akintoye, G. McIntosh, and E. Fitzgerald, “A survey of supply chain collaboration and management in the UK construction industry,” European Journal of Purchasing & Supply Management, vol. 6, pp. 159–168, 2000. [CrossRef] [Google Scholar]
  8. X. Xue, X. Li, Q. Shen, and Y. Wang, “An agent-based framework for supply chain coordination in construction, “ Automation in construction, vol. 14, pp. 413–430, 2005. [CrossRef] [Google Scholar]
  9. A. Dubois and L.-E. Gadde, “The construction industry as a loosely coupled system: implications for productivity and innovation,” Construction Management & Economics, vol. 20, pp. 621–631, 2002. [Google Scholar]
  10. D. D. d. Saram and S. M. Ahmed, “Construction coordination activities: What is important and what consumes time,” Journal of Management in Engineering, vol. 17, pp. 202–213, 2001. [CrossRef] [Google Scholar]
  11. P. Love, G. D. Holt, L. Shen, H. Li, and Z. Irani, “Using systems dynamics to better understand change and rework in construction project management systems,” International Journal of Project Management, vol. 20, pp. 425–436, 2002. [Google Scholar]
  12. T. W. Malone and K. Crowston, “What is coordination theory and how can it help design cooperative work systems,” in Proceedings of the 1990 ACM conference on Computer-supported cooperative work, 1990, pp. 357–370. [CrossRef] [Google Scholar]
  13. K. Crowston, “A coordination theory approach to organizational process design,” Organization Science, vol. 8, pp. 157–175, 1997. [CrossRef] [Google Scholar]
  14. A. S. Chang and F.-Y. Shen, “Coordination needs and supply of construction projects,” Engineering Management Journal, vol. 21, pp. 44–57, 2009. [CrossRef] [Google Scholar]
  15. Y. Wang, “Coordination issues in Chinese large building projects,” Journal of Management in Engineering, 2000. [Google Scholar]
  16. T. Hegazy, E. Zaneldin, and D. Grierson, “Improving design coordination for building projects. I: Information model,” Journal of Construction Engineering and Management, vol. 127, pp. 322–329, 2001. [CrossRef] [Google Scholar]
  17. L. Hossain, “Communications and coordination in construction projects,” Construction Management and Economics, vol. 27, pp. 25–39, 2009. [CrossRef] [Google Scholar]
  18. A. Caballero, S. Ahmed, S. Azhar, and M. Barcala, “Development of an information model to enhance integration and coordination in the construction projects,” NIST SPECIAL PUBLICATION SP, pp. 123–128, 2003. [Google Scholar]
  19. S. A. Nan and A. Strimling, “Coordination in conflict prevention, conflict resolution and peacebuilding,” International Negotiation, vol. 11, pp. 1–6, 2006. [CrossRef] [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.