Open Access
Issue
MATEC Web of Conferences
Volume 15, 2014
Building Surveying, Facilities Management and Engineering Conference (BSFMEC 2014)
Article Number 01036
Number of page(s) 9
DOI https://doi.org/10.1051/matecconf/20141501036
Published online 19 August 2014
  1. Kok, C. (2012). ETP projects to power Malaysia into new status. Retrieved Saturday August 25 2012 [Google Scholar]
  2. Abd Syukor, A. S., Mohammad, M.F., Mahbub, R. and Ismail, F. (2011). Supply Chain Integration in Industrialised Building System in the Malaysian Construction Industry. The Built & Human Environment Review, 4(Special Issue), 108–121. [Google Scholar]
  3. Akmal Aini Othman, S. A. R. (2010). Supply Chain Management In Building Construction Industry: Linking Procurement Process Coordination, Market Orientation And Performance. Journal of Surveying, Construction & Property Vol. 1(Issue 1), 23–46. [Google Scholar]
  4. Nawi, m. n. M., Lee, A., Arif, M. (2010). The Barriers In The Malaysian Construction Industry: A Study In Construction Supply Chain Perspective. [Google Scholar]
  5. Nawi, M. N. M. L., A. Arif, M. (2010). The IBS Barries in the Malaysian Construction Industry: A study in Construction Supply Chain Perspective. Papers And PostGraduate Papers From The Special Track Held At CIB World Building Congress 77–92. [Google Scholar]
  6. Maryam Qays, K. N. M., H.M.A. Al-Mattarneh. (2010). Industrialized Building System in Malaysia: Challanges and the Way Forward. ArchiCivi.com, 1–14. [Google Scholar]
  7. Warszawki, A. (1999). Industrialized and Automated Building Systems. London:E & FN Spon. [Google Scholar]
  8. Badir, Y. F., Kadir, M.R.A and Hashim, A.H.,. (2002). Industrialised Building Systems Construction In Malaysia. Journal of Architectural Engineering, 8(1). [Google Scholar]
  9. Hong, O. C. (2006). Analysis of IBS for school complex. Universiti Teknologi Malaysia (UTM). [Google Scholar]
  10. Thanoon, W. A. M., Peng, L.W., Abdul Kadir, M.R., Jaafar, M.S. and Salit, M.S. (2003). The Experiences of Malaysia and Other Countries in Industrialised Building System in Malaysia. Paper presented at the Proceeding on IBS Seminar., UPM, Malaysia. [Google Scholar]
  11. Kamar, K. A. M. (2011). Kajian Mengenai Kontraktor IBS yang Berdaftar dengan CIDB -Penyataan Masalah Retrieved 19 Okt 2011, 2011, from http://ibsresearch.blogspot.com/ [Google Scholar]
  12. Abdullah, M. R. A. E., C. (2010). Selection criteria framework for choosing industrialized building systems for housing projects. Procs 26th Annual ARCOM Conference, 1131–1139. [Google Scholar]
  13. CIDB. (2003). IBS Roadmap 2003-2010. Kuala Lumpur. [Google Scholar]
  14. Zuhairi Abd. Hamid, K. A. M. K., Mustafa Alshawi, Maria Zura Mohd Zain, Mohd Khairolden Ghani, Ahmad Hazim Abdul Rahim. (2011). Industrialised Building System (IBS) Construction Supply-Chain Strategies of Malaysian Contractors. Sixth International Conference on Construction in the 21st Century (CITC-VI)“Construction Challenges in the New Decade”. [Google Scholar]
  15. M.N.A. Azman, M. S. S. A., T.A. Majid, M.H. Hanafi. (2010). The Common Approach in Off-Site Construction Industry. Australian Journal of Basic and Applied Sciences, 4(9): 4478–4482. [Google Scholar]
  16. M.N.A. Azman, M. S. S. A., T.A. Majid, M.H. Hanafi. (Dec 2010). Perspective of Malaysian Industrialized Building System On The Modern Method Of Construction. APIEMS, The 11th Asia Pasific Industrial Engineering And Management System Conference, 1–7. [Google Scholar]
  17. Malaysia, C. I. D. B. C. (2007). Construction Industry Master Plan (CIMP 2006-2015) Summery Exclusive: Construction Industry Development Board (CIDB) Malaysia [Google Scholar]
  18. Kamarul Anuar Mohamad Kamar, Z. A. H. Z. I. (2010). Modernising The Malaysian Construction Industry Through The Adoption Of Industrialised Building System (Ibs). The Sixth International Conference On Multi-National Joint Ventures For Construction Works Kyoto, Japan. [Google Scholar]
  19. Nawi, M. N. M., 1 Lee, A., 2 and Nor, K. M. 3. (2011). Barriers to Implementation of the Industrialised Building System (IBS) in Malaysia. The Built & Human Environment Review, Volume 4, 22–35. [Google Scholar]
  20. Tam, V. W. Y., C.M. Tam, S.X. Zeng, W.C.Y. Ng. (2007). Towards Adoption of Prefabrication in Construction. Build.Environment, 42, 3642–3654. [Google Scholar]
  21. Hassim, S., M.S. Jaafar, S.A.A.H Sazali. (2009). The Contractor Perception Towers Industrialized Building System Risk In Construction Project In Malaysia. Am. J. Applied Sci., 6, 937–942. [Google Scholar]
  22. Gilmore, D. (2010). Supply Chain Digest. What is Supply Chain Flexibility [Google Scholar]
  23. CIDB. (2005). IBS Digest. Construction Industry Development Board [Google Scholar]
  24. CIDB. (2011). Supply Chain Management In The Malaysian Construction Industry (Cream/0801-07-ST1-SA2-04): Construction Research Institute of Malaysia. [Google Scholar]
  25. David J. Ketchen Jr. a, G. T. M. H. b. (2007). Bridging organization theory and supply chain management: The case of best value supply chains Journal of Operations Management (Science Direct Elsevier), 25, 573–580 [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.