Issue |
MATEC Web Conf.
Volume 87, 2017
The 9th International Unimas Stem Engineering Conference (ENCON 2016) “Innovative Solutions for Engineering and Technology Challenges”
|
|
---|---|---|
Article Number | 01001 | |
Number of page(s) | 7 | |
Section | Civil Engineering | |
DOI | https://doi.org/10.1051/matecconf/20178701001 | |
Published online | 12 December 2016 |
Review in formulating the standard form of contract for Industrialized Building System (IBS) construction approach in Malaysia
1 Faculty Engineering and Technology Infrastructure, Infrastructure University Kuala Lumpur (IUKL) 40300 Kajang, Selangor, Malaysia
2 Faculty Architecture Planning and Surveying, Universiti Teknologi Mara (UiTM), 40450 Shah Alam, Selangor, Malaysia
Industrialised Building System (IBS) is the common term used to represent the prefabrication concept in Malaysia. Based on previous research being done locally and internationally, it is certain that using IBS offers huge benefits in terms of cost, time, productivity and quality. The Malaysian construction industry has been urged to use innovative construction techniques. It is being highlighted under the present Construction Industry Transformation Programme 2016 - 2020 (CITP). These initiatives illustrate the Malaysia government’s commitment in addressing the IBS agenda. Although some efforts have been taken to enhance the IBS adoption in Malaysia, various contract issues have emerged to become major concern amongst the IBS players that have led to delays, disputes, payment and cash flow issues in their projects. Formulating a dedicated standard form of contract for IBS construction approach is necessary to address the concerns. Therefore, the aim of the main research is to formulate the standard form of contract for IBS projects that will assist authorities and IBS industry players in mitigating the issues and challenges from the contractual perspectives. However, this paper will only present the literature reviews and findings from a preliminary survey conducted to establish pertinent contractual issues and challenges on the subject matter.
© The Authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.