Issue |
MATEC Web of Conferences
Volume 15, 2014
Building Surveying, Facilities Management and Engineering Conference (BSFMEC 2014)
|
|
---|---|---|
Article Number | 01036 | |
Number of page(s) | 9 | |
DOI | https://doi.org/10.1051/matecconf/20141501036 | |
Published online | 19 August 2014 |
Flexibility of Supply Chain in Industrialised Building System (IBS)
1 College of Business, Universiti Utara Malaysia (UUM), Sintok, Kedah, 06010, Malaysia
2 School of Environmental Engineering, Universiti Malaysia Perlis (UniMAP), Kompleks Pusat Pengajian Jejawi 3, Arau, Perlis, 02600, Malaysia
It is irrefutable that the construction industry is in need of a highly technological construction method or system for the simple aim of giving it a push it deserves. In Malaysia this technologically enhanced method is known as the Indutrialised Building System (IBS). Concerted efforts have been made for the past decade by various responsible parties especially by the government. Therefore, the IBS ‘Road Map’ 2003–2010 was introduced and now continues with the IBS ‘road map’ 2011-2015. However, its performance is still at its infancy, which target is only at an initial stage. This study seeks to identify and analyse the factor of the IBS’ system’s supply chain flexibility as a factor on the success of the system itself. It has been a suspicion that there exists a condition and situation where the supply chain is too rigid and is not flexible in fulfilling the needs and demands of the IBS development in Malaysia. This inflexible situation has brought about a broad range of problems and has stood in the way of the development of the industrialised building system, despite it being introduced since 1964, or 49 years ago. Flexibility in the IBS supply chain is very important and is associated with other industries like transportation, manufacturing industry, and others. Up until now, we have yet to discover any special studies related to the flexibility in the IBS supply chain in this country. Responding to this challenge, this research is hoped to be able to provide sufficient feedback to the solution to the IBS supply chain flexibility issue. The researcher is confident that the poor system flow of supply chain has impeded the advancement of the Industrialised Building System that has long been open to debate.
© Owned by the authors, published by EDP Sciences, 2014
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.