Open Access
Issue
MATEC Web Conf.
Volume 343, 2021
10th International Conference on Manufacturing Science and Education – MSE 2021
Article Number 05008
Number of page(s) 8
Section Quality Engineering and Management
DOI https://doi.org/10.1051/matecconf/202134305008
Published online 04 August 2021
  1. C. Kallhoff, H. Kotzab, Supply Management Research, 257–272 (2016) [CrossRef] [Google Scholar]
  2. https://topqm.de/de/aktuelles/vda_6.3_yellow_print_3.3rd_completely_revised_editionjuly_2016.pdf [Accessed: 3 March 2021] [Google Scholar]
  3. https://vdaqmc.de/fileadmin/redakteur/Publikationen/VDA_Band_SI_FAQ/FAQ_SI_VDA_6_0_DE_Maerz-2016.pdf [Accessed: 3 March 2021] [Google Scholar]
  4. https://www.vda.de/de.html [Accessed: 14 January 2019] [Google Scholar]
  5. ISO 9000:2015: Quality management systems Fundamentals and vocabulary (2015) [Google Scholar]
  6. C. T. Albulescu, A. Draghici, G. M. Fistis, A. Truşculescu, Procedia-Social and Behavioral Sciences, 221 (2016) [Google Scholar]
  7. F. J. Brunner, Japanische Erfolgskonzepte: KAIZEN, KVP (2008) [Google Scholar]
  8. A. Douglas, TQM Journal, 21 (2009) [Google Scholar]
  9. M. Rasamanie, K. Kanapathy, International Journal of Business and Social Science, 2 (2011) [Google Scholar]
  10. G. Giakatis, T. Enkawa, K. Washitani, Total Quality Management, 12 (2001) [Google Scholar]
  11. N. Chiadamrong, TQM & Business Excellence, 14 (2003) [Google Scholar]
  12. R. Kent, Manufacturing strategy for window fabricators 14 – the cost of quality. Available at: www.tanagram.co.uk [Accessed: 3 March 2021] [Google Scholar]
  13. C. Yang, Total Quality Management & Business Excellence, 19 (2008) [Google Scholar]
  14. A. Töpfer, Six Sigma, Konzeption und Erfolgsbeispiele für praktizierte Null-FehlerQualität. Berlin – Heidelberg (Springer Science & Business Media, 2007) [Google Scholar]
  15. A. Reitz, Lean TPM in 12 Schritten zum schlanken Managementsystem; effektive Prozesse für alle Unternehmensbereiche; gesteigerte Wettbewerbsfähigkeit durch KVP; Erfolge messen mit der Lean-TPM-Scorecard (München, 2008) [Google Scholar]
  16. M. Kropik, Produktionsleitsysteme in der Automobilfertigung (Science & Business Media, 2009) [Google Scholar]
  17. P. Gorecki, P. Pautsch, Praxisbuch Lean Management: Der Weg zur operativen Excellence (2014) [Google Scholar]
  18. A. Schiffanerova, V. Journal of Quality & Reliability 23 (2006) [Google Scholar]
  19. P. Crosby, Quality is Free. New York (McGraw-Hill, 1979) [Google Scholar]
  20. A. Feigenbaum, Quality Progress, 10 (without year) [Google Scholar]
  21. W. J. Morse, K.M. Poston, Journal of Cost, Management for the Manufacturing Industry (1977) [Google Scholar]
  22. J. Niemann, Eine Methodik zum dynamischen Life Cycle Controlling von Produktionssystemen, (Stuttgart, 2007) [Google Scholar]
  23. K. Yong-Woo, Activity Based Costing for Construction Companies, (Wiley Blackwell, 2017) [Google Scholar]
  24. R. Kaplan, S. Anderson, Time-driven activity-based Costing, (Harvard Business School, 2007) [Google Scholar]
  25. R. Cooper Activity-Based Costing (Gabler Verlag, Wiesbaden, 1992) [Google Scholar]
  26. C. Schawel, F. Billing Top 100 Management Tools (Gabler Verlag, Wiesbaden, 2014) [Google Scholar]
  27. R. Lueg, N. Storgaard, IJSM 17 (2017) [CrossRef] [Google Scholar]
  28. M. Gosselin, Handbook of Management Accounting, 2 (2006) [Google Scholar]
  29. R. Maelah, D. Ibrahim, Journal of Business and Society, 7, 1 (2006) [Google Scholar]
  30. A. Sohal, S. Walter, W. Chung, Integrated Manufacturing Systems, 9, 3, (1998) [Google Scholar]
  31. A. Van der Stede, M. Young, C. Chen, Handbook of Management Accounting Research, Elsevier, 1, 1 (2010) [Google Scholar]
  32. J. Niemann, ICPR-AEM, The Life Cycle Index – A tool to measure life cycle management, (Cluj –Napoca, Romania, 2012) [Google Scholar]
  33. J. Niemann, A. Pisla, Sustainability 12, 10 (2018) [Google Scholar]
  34. J. Niemann, A. Pisla, Life Cycle Management of Machines and Mechanisms. Springer Nature (Switzerland, 2021) [Google Scholar]
  35. J. Niemann, S. Tichkiewitch, E. Westkämper, Design of Sustainable Product Life Cycles (Springer Verlag, Heidelberg Berlin, 2009) [Google Scholar]
  36. L. Morar, E. Westkämper, I. Abrudan, A. Pisla, J. Niemann, I. Manole, Planning and Operation of Production Systems (Fraunhofer IRB Verlag, 2008) [Google Scholar]
  37. D. Wood, Principles of Quality Costs, Fourth Edition: Financial Measures for strategic implementation of quality management (Milwaukee, Wisconsin, ASQ Quality Press, 2013) [Google Scholar]
  38. H. Brüggemann, P. Bremer, Grundlagen Qualitätsmanagement, 2. überarbeitete und erweiterte Auflage (Weisbaden, Springer Viehweg, 2015) [Google Scholar]
  39. F. Abolhassan, Kundenzufriedenheit im IT-Outsourcing: Das Optimum realisieren (Springer Fachmedien Wiesbaden GmbH, 2014) [Google Scholar]
  40. W. Appelfeller, W. Buchholz, Supplier Relationship Management: Strategie, Organisation und IT des modernen Beschaffungsmanagements (Gabler Verlag, 2011) [Google Scholar]
  41. https://www.atkearney.de/documents/856314/11139816/Quality+4-Preventive+Holistic+Future-Proof_DEUTSCH_04.pdf/9c86d61c-1e48-49ab-9caf7260f63994e0, [Accessed: 03 March 2021] [Google Scholar]
  42. T. Bauernhansl, [Online]. Available at: https://www.qz-online.de/qz-zeitschrift/archiv/artikel/industrie-4-0-aendert-alles--auch-fuerdasqualitaetsmanagement-1426242.html [Accessed: 03 March 2021] [Google Scholar]
  43. S. Durst, Strategische Lieferantenentwicklung–Rahmenbedingungen, Optionen und Auswirkungen auf Abnehmer und Lieferant (Springer, 2011) [Google Scholar]
  44. M. Ferber, [Online] Available at: https://www.tqugroup.com/wedokumente/News/PrsentationenImpulsveranstaltungQM4.018.04.2016.pdf [Accessed: 03 March 2021] [Google Scholar]
  45. F. Pürzel et al.: Hanser Verlag, 4, 108 (2013) [Google Scholar]
  46. R. Refflinghaus, C. Kern, S. Klute-Wenig, Qualitätsmanagement 4.0–Status Quo! Quo vadis?, (kassel university press GmbH, 2016) [Google Scholar]
  47. M. Omurgonulsen, Total Quality Management & Business Excellence, 20, 5 (2009) [Google Scholar]
  48. W. Tsai, W. Hsu, Total Quality Management and Business Excellence, 21, 4 (2010) [Google Scholar]
  49. F. Artischewski, [Online]. Available at: http://digital.bibliothek.uni-halle.de/pe/content/titleinfo/2514241 [Accessed: 03 March 2021] [Google Scholar]
  50. T. Aruväli, W. Maass, T. Otto, Procedia Engineering 69 (2014) [Google Scholar]
  51. J. Niemann, Life Cycle Management-das Paradigma der ganzheitlichen Produktlebenslaufbetrachtung (Springer-Vieweg, VDI Buch, Berlin 2017) [Google Scholar]
  52. G. Dragoi, A. Draghici, S. M. Rosu, C. E. Cotet, Information Resources Management Journal 3, 23 (2010) [Google Scholar]
  53. C. Dufour, A. Draghici, Management 20, 22 (2020) [Google Scholar]
  54. D. Robescu, D. Fatol, V. Baesu, A. Draghici, Management, 20, 22 (2020) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.