Open Access
Issue |
MATEC Web Conf.
Volume 276, 2019
International Conference on Advances in Civil and Environmental Engineering (ICAnCEE 2018)
|
|
---|---|---|
Article Number | 02026 | |
Number of page(s) | 8 | |
Section | Construction Management | |
DOI | https://doi.org/10.1051/matecconf/201927602026 | |
Published online | 15 March 2019 |
- I. Soeharto, Project management (from conceptual to operational) (Erlangga, Jakarta, 1999) [Google Scholar]
- A. Pratama, Analysis of the acceleration of the time (Project case study: SKPD Office Building B3 in Tenayan) (Univ. Riau, Pekanbaru 2016) [Google Scholar]
- Y. Rasyid, Analisa percepatan produktivitas akibat CCO, studi kasus apron bandara SSK II Pekanbaru (Undergraduate Thesis, Universitas Riau, Pekanbaru, 2015) [Google Scholar]
- T. Adipa, Analisis percepatan pelaksanaan pekerjaan pada proyek pembangunan jalan Simpang Petai-Sari Galuh Kecamatan Rumbio Jaya Kabupaten Kampar (Undergraduate Thesis, Universitas Riau, Pekanbaru, 2015) [Google Scholar]
- A.A. Karaini, Introduction to project management (Univ. Gunadarma, Jakarta, 2002) [Google Scholar]
- H. Kerzner, Project management, A system to planning, scheduling, and Controlling (Van Nostrand Reinbold, New York, 1995) [Google Scholar]
- M. Callahan, Construction project scheduling (McGraw Hill, New York, 1992) [Google Scholar]
- R. Amelia, Alternative to reduce the impact of the delay of the project on time and cost (Univ. Riau, Pekanbaru 2009) [Google Scholar]
- Badri, Dasar-dasar network planning (Rineka, Jakarta, 1997) [Google Scholar]
- Yamit, Project management (Graha Knowledge, Yogyakarta, 2000) [Google Scholar]
- Levis, Atherley. Delay construction (Langford, New York, 1996) [Google Scholar]
- Sadjana. The study of delay in the project on increased costs contractor (ITB, Bandung 1995) [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.