Cost and time analysis of graving dock project
1
Ocean Engineering Department, Faculty of Marine Technology, Institut Teknologi Sepuluh Nopember, Surabaya,
Indonesia
2
Graduate Student, Ocean Engineering Department, Faculty of Marine Technology, Institut Teknologi Sepuluh Nopember, Surabaya,
Indonesia
* Corresponding Author : silvianita@oe.its.ac.id
The construction of new shipyard in the Cilacap area is one of the best ways to reduce the accumulation of vessels. The construction of shipyard has many risks, one of the risks that can occur during the construction of the shipyard is in terms of cost and time. Project scheduling is a tool to make sure the project finished on time. This paper discusses project scheduling and cost calculation using Critical Path Method (CPM) and Program Evaluation Review Technique (PERT) method for Graving Dock project development in Cilacap. Project scheduling is useful to indicate the relation of each activity to another. This paper will discuss the critical activities during Gravity Dock development and the duration for the whole project using CPM. The next step is to determine the probability of the completing project that can be finished within the time frame using PERT. Based on the CPM analysis, the probability of Graving Dock project can be finished in 204 days is 79,81 %. The total cost for Graving Dock project in Cilacap is Rp. 6.486.122.769.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.