Analysis of the acceleration of the time on the project showroom Nissan, office and workshop in Pekanbaru city
Department of Civil Engineering, Universitas Riau, Pekanbaru, Indonesia
* Corresponding author: tisyaadelia@gmail.com
Completion time determination in project management is among the first and the most important in the process of planning because it can be the basis for the whole planning. Project completion delay result in the elongation of construction time thus it can inflict a costly penalty due to the delays. Project management so important for implementation a project for avoid problem that can create disadvantages for owner or contractor, one of the problems that commonly occur in a project is a estimated cost and timework isn’t fit with the planning. Project construction Nissan, Office and Workshop at Pekanbaru City were late from contract duration. Work can more fast with 3 ways, alternative overtime work, alternative add more manpower, and alternative shift system. The analysis conducted focuses on unfinished work. Only work with critical path in analysis. Analysis result obtained cost of construction acceleration that caused by overtime alternative is IDR 15,393,542.00 overtime implemented for 4 hours in a day. Workers additional alternative that adjusted by field requirement result is IDR 25,500,000.00 and shift alternative, construction acceleration that caused by shift alternative is IDR 38,940,000.00. In conclusion, the most effective construction acceleration method is overtime alternative, obtained the minimum financial loss and recommended to use for the construction acceleration.
© Owned by the authors, published by EDP Sciences, 2012
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.