Ranking of Delay Factors for Makkah’s Construction Industry
1 Faculty of Civil and Environmental Engineering, Universiti Tun Hussein Onn Malaysia, 86400 Parit Raja, Johor, Malaysia
2 Sariya Contracting Company Ltd, Novotel Business Park, Tower 2, 3rd Floor, Dammam, Khobar Highway, Post Box: 4486, Al Khobar 31952, Kingdom of Saudi
* Corresponding author: df080116@gmail.com
This paper presents identification of significant delay factors encountered by Makkah’s construction industry using quantitative approach. A structured questionnaire developed based on literature review was verified through pilot study involved selected construction experts. Questionnaire survey was conducted amongst Makkah construction practitioners include contractors, consultants and project management consultancy. The survey managed to collect 100 valid responses which were used to rank the factors using average index approach. Results of the analysis for 10 most significant factors causing construction delay in Makkah construction industry are Difficulties in financing project by contractor, Poor coordination between parties, Shortage of manpower, Delays in producing design documents, Improper planning and scheduling of the project, Delay in progress payments, Low productivity level of labour, Poor communication between parties, Unqualified workforce and Poor contract management. This finding is helpful to Makkah construction’s community particularly projects’ stakeholders in avoiding potential delay for their future projects.
© The Authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.