Open Access
Issue |
MATEC Web Conf.
Volume 192, 2018
The 4th International Conference on Engineering, Applied Sciences and Technology (ICEAST 2018) “Exploring Innovative Solutions for Smart Society”
|
|
---|---|---|
Article Number | 01027 | |
Number of page(s) | 4 | |
Section | Track 1: Industrial Engineering, Materials and Manufacturing | |
DOI | https://doi.org/10.1051/matecconf/201819201027 | |
Published online | 14 August 2018 |
- Project Management Institute, A Guide to the Project Management Body of Knowledge (PMBOK® Guide) – Fifth Edition (2013) [Google Scholar]
- Samira Zareei, Project Scheduling for Constructing Biogas Plant Using Critical Path Method. Renewable and Sustainable Energy Reviews 81, (2018), p. 756-759 [CrossRef] [Google Scholar]
- Yang JB, How the Critical Chain Scheduling Method is Working for Construction, Cost Eng 49(4), (2007), p. 25–32 [Google Scholar]
- Fahimifard SM, Kehkha AA, Application of Project Scheduling in Agriculture (Case Study: Grape Garden Stabilization), Am-Eurasia J Agric Environ Sci 5(3), (2009), p. 313–21 [Google Scholar]
- Pollack JB. Project Management Software Usage Patterns and Suggested Research Directions for Future Development. Proj Manag J 29, (1998), p. 19–29 [CrossRef] [Google Scholar]
- Monjezi N, Sheikhdavoodi MJ, Basirzadeh H, Zakidizaji H., Analysis and Evaluation of Mechanized Greenhouse Construction Project Using CPM Methods, Res Appl Sci Eng Technol 4(18), (2012), p. 3267–73 [Google Scholar]
- Abdi R, Ghasemzadeh HR, Abdollahpour S, Sabzeparvar M, Dabbag Mohammadi, Nasab A., Modeling and Analysis of Mechanization Projects of Wheat Production by GERT Networks, Agric Sci China 9(7), (2010), p. 1078–83. [CrossRef] [Google Scholar]
- Smith P. Agricultural Project Management: Monitoring and Control of Implementation, Elsevier Applied Science Publisher; (1984). p. 190. [Google Scholar]
- Zargar M., Project Control, Parham, Tehran, Iran; (2004) [Google Scholar]
- Krystyna A., Application of Critical Chain Management in Construction Projects Schedules in a Multi-Project Environment: a Case Study. Procedia Engineering 182, (2017), p. 33– 41. [CrossRef] [Google Scholar]
- H.A. Hornstein. The Integration of Project Management and Organizational Change Management iss Now A Necessity, Int. J. Proj. Manag., (2014) [Google Scholar]
- Kerzner, H., Project Management: A Systems Approach to Planning, Scheduling, and Controlling, John Wiley & Sons, Hoboken, N. J, 11th edition, (2013) [Google Scholar]
- Johnson, S.B., The Secret of Apollo: Systems Management in American and European Space Programs, The Johns Hopkins University Press, Baltimore, (2002). [Google Scholar]
- Morris, P.W.G., Pinto, J.K., Soderlund, J. (Eds.), The Oxford Handbook of Project Management, Oxford University Press, Oxford, UK, (2012) [Google Scholar]
- Ma Jun-jie, Qi Jian-xun, Study on Critical Path Method with Fixed Time Parameter in Network Planning Technology, Third International Symposium on Information Science and Engineering, 96, (2010) [Google Scholar]
- S. E. Elmaghraby, On criticality and sentivity in activity networks, European Journal of Operational Research, 127, (2000), p. 220-238 [CrossRef] [Google Scholar]
- J. E. Kelley Jr. and M. R. Walker, Critical path planning and scheduling, Proceedings of the Eastern Joint Computational Conference, 16, (1959), p. 160-172 [Google Scholar]
- Amy H. I. Lee, He-Yau Kang, Tzu-Ting Huang, Project Management Model for Constructing A Renewable Energy Plant, Procedia Engineering, 174, (2017), p. 145–154 [CrossRef] [Google Scholar]
- K.A. Chrysafis, B.K. Papadopoulos, Approaching Activity Duration in PERT By Means of Fuzzy Sets Theory And Statistics, J Intell Fuzzy Syst 26(2), (2014), p. 577-587 [Google Scholar]
- Mete MAZLUM, Ali Fuat GÜNERİ. CPM, PERT and Project Management with Fuzzy Logic Technique and Implementation on a Business, Procedia - Social and Behavioral Sciences 210, (2015), p. 348 – 357 [CrossRef] [Google Scholar]
- Dan Trietsch, Kenneth R. Baker, PERT 21: Fitting PERT/CPM for Use in the 21st Century, International Journal of Project Management 30, (2012), p. 490–502. [CrossRef] [Google Scholar]
- Clark, C.E., The PERT Model for The Distribution of an Activity Time, Operations Research 10, (1962), p. 405–406. [CrossRef] [Google Scholar]
- Malcolm, D.G., Roseboom, J.H., Clark, C.E., Fazar, W., Application of a Technique for a Research and Development Program Evaluation, Operations Research 7, (1959), p. 646–669. [Google Scholar]
- Kelley, J.E., Critical-Path Planning and Scheduling: Mathematical Basis, Operations Research 9 (3), (1961), p. 296–320. [CrossRef] [Google Scholar]
- Kelley, J.E., Walker, M.R., Critical Path Planning and Scheduling, Proceedings of the Eastern Joint Computer Conference, Boston, (1959), p. 160–173 [Google Scholar]
- Kelley, J.E., The Critical Path Method: Resources Planning and Scheduling, Chapter 21, Muth, J., Thompson, G.L. (Eds.), Industrial Scheduling, Prentice-Hall, (1963), p. 347–365 [Google Scholar]
- Wiest, J.D., Some Properties of Schedules for Large Projects with Limited Resources, Operations Research 12, (1964), p. 395– 418. [CrossRef] [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.