Modeling of construction process scheduling with Time Coupling Methods
Wrocław University of Science and Technology, Poland
* Corresponding author: lukasz.lodozynski@pwr.edu.pl
The topic of the paper is referred to optimization model for multiobjective solutions for construction management. It is known in literature as Time Coupling Methods (TCM). It presents another approach to scheduling methods from known methods like LSM, CPM/PERT, LOC, RSM. TCM is based on couplings that bounds activities in technology and management. The new modifications to TCM will be presented that add flexibility when dealing with complex civil engineering problems.
© The Authors, published by EDP Sciences, 2018
This is an open access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.