Open Access
Issue |
MATEC Web Conf.
Volume 183, 2018
12th International Conference Quality Production Improvement – QPI 2018
|
|
---|---|---|
Article Number | 04004 | |
Number of page(s) | 6 | |
Section | Management | |
DOI | https://doi.org/10.1051/matecconf/201818304004 | |
Published online | 31 July 2018 |
- R. Ulewicz, M. Nowicka-Skowron, 26th International Conference on Metallurgy and Materials, Total Quality Management in practice of polish metallurgical companies (Tanger Ltd., Ostrava, 2017) [Google Scholar]
- D. Klimecka-Tatar, Production Engeenering Archives, 17 (2017) [Google Scholar]
- K. Knop, J. Rosak-Szyrocka, 25th Anniversary International Conference on Metallurgy and Materials, Evaluating and improving the effectiveness of the rolling mill in the production of medium steel sections in the selected company from the metallurgical industry (Tanger Ltd., Ostrava, 2016) [Google Scholar]
- M. Zasadzień, Production Engeenering Archives, 11 (2016) [Google Scholar]
- M. Afsharian, V.V. Podinovski, EJOR, 268 (2018) [CrossRef] [Google Scholar]
- P. Saengudomlert, Optimization for communications and networks (Boca Raton, CRC Press, 2012) [Google Scholar]
- A. Piechna, PiKI, 55 (2012) [Google Scholar]
- S. Kreter, A. Schutt, P.J. Stuckey, EJOR, 266 (2018) [Google Scholar]
- I. Azzini, R. Muresano, M. Ratto, CLS&S, 52 (2018) [Google Scholar]
- S. Nagar, Introduction to Octave: For Engineers and Scientists (Apress, NewYork, 2018) [CrossRef] [Google Scholar]
- N. Radek, J. Pietraszek, B. Antoszewski, Adv. Mat. Res.-Switz. 874, 29 (2014) [Google Scholar]
- P. Szataniak, F. Novy, R. Ulewicz, 23rd International Conference on Metallurgy And Materials, 778-783 (2014) [Google Scholar]
- T. Lipinski, A. Wach, 23rd International Conference on Metallurgy And Materials, 23rd International Conference on Metallurgy And Materials, 778-783 (2014) [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.