Open Access
Issue
MATEC Web Conf.
Volume 103, 2017
International Symposium on Civil and Environmental Engineering 2016 (ISCEE 2016)
Article Number 03004
Number of page(s) 8
Section Sustainable Construction, Management and Green Building
DOI https://doi.org/10.1051/matecconf/201710303004
Published online 05 April 2017
  1. A.P.C. Chan and T.Y.F. Ma, Materials wastage on commercial projects – contractor’s view, Proc. of the Sixth East Asia-Pacific Conf. on Structure Engineering and Construction, Taipei, Taiwan, (1998) [Google Scholar]
  2. L. Koskela, Application of new production theory in construction, CIFE Technical Report No. 72, Center for Integrated Facility Engineering, Stanford University, Finland, (1992) [Google Scholar]
  3. G. Polat, Precast concrete systems in developing vs industrialized countries, J. Civ. Eng. Manag., 16(1), 85–94, (2010) [CrossRef] [Google Scholar]
  4. W.A. Thanoon, L.W. Peng, M.R. . Kadir, M.S. Jaafar and M.S. Salit, The essential characteristics of industrialised building system, Int. Conf. Ind. Build. Syst, Kuala Lumpur, Malaysia, 1999, 10–11, (2003) [Google Scholar]
  5. M. Abedi, N.M. Rawai, M.S. Fathi and A.K. Mirasa, Cloud computing as a construction collaboration tool for precast supply chain management, J. Teknol., 70(7), 1–7, (2014) [Google Scholar]
  6. A. Neville, Some aspects of sustainability, PCI J., 50(5), 2–5, (2005) [Google Scholar]
  7. Y. Chen, G.E. Okudan and D.R. Riley, Sustainable performance criteria for construction method selection in concrete buildings, Autom. Constr., 19(2), 235–244, (2010) [CrossRef] [Google Scholar]
  8. A.F. Al-Bazi, N. Dawood and J.T. Dean, Improving performance and the reliability of off-site pre-cast concrete production operations using simulation optimisation, J. Inf. Technol. Constr., 15, 335–356, (2010) [Google Scholar]
  9. K.N. Jha and K.C. Iyer, Critical determinants of project coordination, Int. J. Proj. Manag., 24, (4), 314–322, (2006) [CrossRef] [Google Scholar]
  10. W.S. Alaloul, M.S. Liew and N.A.W.A. Zawawi, The characteristics of coordination process in construction projects, Proc. of the Int. Symposium on Technology Management and Emerging Technologies, IEEE, 159–164, (2015) [Google Scholar]
  11. K.H. Tey, M.Y. Aminah, I. Syuhaida and F. W. Lee, A conceptual study of key barriers in construction project coordination, J. Organ. Manag. Stud., 2012, 333–346, (2012) [Google Scholar]
  12. G. Higgin and N. Jessop, Communications in the building industry: The report of a pilot study, Tavistock Publications, London, United Kingdom, (1965) [Google Scholar]
  13. M.J. Meixell, M. Nunez and A. Talalayevsky, Activity structures in a project-based environment: A coordination theory perspective, Eng. Manag. IEEE Trans., 53, 285–296, (2006) [CrossRef] [Google Scholar]
  14. Ö. Wikforss and A. Löfgren, Rethinking communication in construction, Proc. of the 4th Nordic Conf. on Construction Economics and Organisation, 337–344, (2007) [Google Scholar]
  15. K.A.M. Kamar, Z.A. Hamid, M. Zura, M. Zain, A. Hazim, A. Rahim, M.K. Ghani, M. Nor, A. Azman, T.A. Majid, M. Sanusi, S. Ahamad and M.N. Azman, Drivers and barriers of industrialised building system (IBS) roadmaps in Malaysia, Malaysian Constr. Res. J., 9(1), 1985–3807, (2012) [Google Scholar]
  16. W.T. Chan and H. Hu, Constraint programming approach to precast production scheduling, J. Constr. Eng. Manag., 128(6), 513–521, (2002) [CrossRef] [Google Scholar]
  17. E. Dassori and M. Frasani, Support system for project management and production of concrete precast elements, Int. Conf. on Advances in Building Technology, 1689–1696, (2002) [Google Scholar]
  18. M.R. Yusof, A.H. Nawawi, M.F. Mohammad and M.F. Musa, Key success factors in IBS project management, Colloquium on Humanities, Science and Engineering, IEEE, 210–215, (2015) [Google Scholar]
  19. N.B. Kiong and Z.A. Akasah, Maintenance factor for precast concrete in IBS: A review, 2011 Natl. Postgrad. Conf. - Energy Sustain. Explor. Innov. Minds, NPC 2011, Kuala Lumpur, Malaysia, (2011) [Google Scholar]
  20. S.V.N. Biscaya, Coordination and management of information for construction design projects: A framework for Portugal, PhD Thesis, University of Salford, United Kingdom, (2012) [Google Scholar]
  21. I. Kaner, R. Sacks, W. Kassian and T. Quitt, Case studies of BIM adoption for precast concrete design by mid-sized structural engineering firms, Electron. J. Inf. Technol. Constr., 13(2007), 303–323, (2008) [Google Scholar]
  22. V. Mlinarić and Z. Sigmund, Problems in large scale precast construction projects, CIB Jt. Int. Symp. 2009 Constr. Facing Worldw. Challenges, Dubrovnik, Croatia, 182–188, (2009) [Google Scholar]
  23. W. Peng and L.S. Pheng, Lean production, value chain and sustainability in precast concrete factory – a case study in Singapore, Lean Constr. J., 2011, 19–36, (2010) [Google Scholar]
  24. P.W. and S.P. Low, Lean management and low carbon emissions in precast concrete Factories in Singapore, J. Archit. Eng., 18, 176–186, (2011) [Google Scholar]
  25. S. Senaratne and S. Ekanayake, Evaluation of application of lean principles to precast concrete bridge beam production process, J. Archit. Eng., 18(2), 94–106, (2012) [CrossRef] [Google Scholar]
  26. C.T. Haas and W.R. Fagerlund, Preliminary research on prefabrication, pre-assembly, modularization and off-site fabrication in construction, PPMOF Technical Reprot No. 171, The Construction Industry Institute, Austin, Texas, (2002) [Google Scholar]
  27. I.L. Jabar, F. Ismail and A.A. Mustafa, Issues in managing construction phase of IBS Projects, Procedia - Soc. Behav. Sci., 101, 81–89, (2013) [CrossRef] [Google Scholar]
  28. A. Warszawski, Industrialised and automated building systems, E & FN Spon, London, United Kingdom, (1999) [CrossRef] [Google Scholar]
  29. M.N.A. Azman, M.S.S. Ahamad, T.A. Majid and M.N.S.A. Shah, A study of precast concrete in Malaysia, Concrete, 46(10), 50–52, (2012) [Google Scholar]
  30. Y.W. Cheong, H.P. Kwan and A. D. Hariyanto, Quality control in precast production: a case study on tunnel segment manufacture, Dimensi Teknik Arsitektur, 33(1),153–164, (2005) [Google Scholar]
  31. A. Rönneblad and T. Olofsson, Application of IFC in design and production of precast concrete constructions, J. Inf. Technol. Constr. (ITcon), 8, 167–179, (2003) [Google Scholar]
  32. L.S. Pheng and C.J. Chuan, Just-in-time management in precast concrete construction: a survey of the readiness of main contractors in Singapore, Integr. Manuf. Syst., 12, 416–429, (2001) [CrossRef] [Google Scholar]
  33. W.M.N.W. Muhammad, M.A. Azman, M.K.F. Othman, N.A. Hadi, S.N.S. Sahimi, and M.F. Mohammad, The insight of industrialised building system (IBS) by Bumiputera construction players, The 3rd Int. Conf. on Civil and Environmental Engineering for Sustainability Malacca, Malaysia, (2016) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.