Open Access
Issue |
MATEC Web Conf.
Volume 100, 2017
13th Global Congress on Manufacturing and Management (GCMM 2016)
|
|
---|---|---|
Article Number | 05028 | |
Number of page(s) | 8 | |
Section | Part 5: Management Engineering | |
DOI | https://doi.org/10.1051/matecconf/201710005028 | |
Published online | 08 March 2017 |
- C. Cao A Study on Identification of the Risk Factors of Highway Projects with PPP (Public-Private Partneiship) Financing Mode. Journal of Chongqing Three Gorges University, 3: 75–78(2013). [Google Scholar]
- Y.W. Liu. Management Research of the Financial Risks of Project Financing Based on PPP Model. Value Engineering, 2015(12):16–18. [Google Scholar]
- Y.L. Yin X.L.Yin Study on Risk Share in PPP Construction Mode of Beijing Metro Line 4. Railway Transport and Economy, 10:6–11(2013). [Google Scholar]
- B. Ai, X.C. Lu. Model comparison and risk prevention of PPP financing of government project procurement. Seeker, 4:19–21(2008). [Google Scholar]
- Q.L. Kong. Risk Management of Urban Infrastructure Construction Based on PPP Model. Construction Engineering Technology and Design, 10(2015). [Google Scholar]
- A.M. Wu. Risk Analysis and Prevention of Engineering Project Financing. Architectural knowledge: Academic Journal, 3:249–249 (2013). [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.