Issue |
MATEC Web Conf.
Volume 100, 2017
13th Global Congress on Manufacturing and Management (GCMM 2016)
|
|
---|---|---|
Article Number | 05047 | |
Number of page(s) | 8 | |
Section | Part 5: Management Engineering | |
DOI | https://doi.org/10.1051/matecconf/201710005047 | |
Published online | 08 March 2017 |
Comprehensive Transportation Logistics Network Level Layout Based on Principal Component Factor and Cluster Analysis
School of Management Engineering, Zhengzhou University, Zhengzhou Henan, China
Corresponding author: 13676995513@139.com
Comprehensive Transportation Logistics Network (CTLN) acts as a crucial prop and fundamental carrier for regional economic and social development. Firstly, an index system for evaluating the development of regional Comprehensive Transportation Logistics (CTL) nodes is established; then regional CTLN nodes are ranked according to their importance by the method of Principal Component Analysis(PCA), and main factors affecting the development of regional CTL nodes are analyzed by applying factor analysis, and regional CTL nodes are classified according to their feature similarities by applying cluster analysis; and then level structure of constructing regional CTLN is proposed. Finally, combined with geographic locations of different nodes, level layout model of CTLN of the whole region is obtained. Taking Henan province this region as an instance, level layout model of hub-and-spoke CTLN taking Zhengzhou at its core is proposed after analysis, providing a reference basis for constructing CTLN in whole province scientifically and reasonably.
© The Authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.