Open Access
Issue
MATEC Web of Conferences
Volume 55, 2016
2016 Asia Conference on Power and Electrical Engineering (ACPEE 2016)
Article Number 06002
Number of page(s) 6
Section Dynamic Load Modelling and Renewable Energy System
DOI https://doi.org/10.1051/matecconf/20165506002
Published online 25 April 2016
  1. S. Teleke, M. E. Baran, A. Huang, BhattacharyaS., L. Anderson, IEEE Trans. Energy Convers., 24, 725–732 (2009) [CrossRef]
  2. WangP., Operational adequacy studies of power systems with wind farms and energy storage, Power and Energy Society General Meeting (PES), 1 (2013)
  3. Z. Y. Gao, Wang, P., Wang, J., Impacts of energy storage on reliability of power systems with WTGs, Probabilistic Methods Applied to Power Systems (PMAPS ), 65–70 (2010)
  4. C. A. Hill, SuchM. C., D. Chen, GonzalezJ., W. M. Grady, IEEE Trans. Smart Grid, 3, 850–857 (2012) [CrossRef]
  5. TelekeS., M. E. Baran, BhattacharyaS., A. Q. Huang, Trans. IEEE Sustain. Energy, 1, 117–124 (2010) [CrossRef]
  6. R. Zamora, SrivastavaA. K., Energy management and control algorithms for integration of energy storage within microgrid, Industrial Electronics (ISE ), 1805–1810 (2014)
  7. K. Xie, BillintonR., Electr. Pow. Syst. Res., 79, 687–693 (2009) [CrossRef]
  8. J. M. Morales, ConejoA. J., J. Perez-Ruiz, IEEE Trans. Power Syst., 26, 820–828 (2011) [CrossRef]
  9. VillanuevaD., A. Feijoo, PazosJ. L., IEEE Trans. Sustain. Energy, 3, 142–149 (2012) [CrossRef]
  10. F. Vallee, LobryJ., O. Deblecker, Trans. IEEE Syst. Power, 22, 2232–2239 (2007) [CrossRef]
  11. LiuP. L., A. Der Kiureghian, Probab. Eng. Mech., 1, 105–112 (1986) [CrossRef]
  12. MoralesJ. M., R. Mínguez, ConejoA. J., Appl. Energy, 87, 843–855 (2010) [CrossRef]
  13. H. Wang, X. Bai, Adequacy assessment of generating systems incorporating wind, PV and energy storage, Innovative Smart Grid Technologies- Asia (ISGT Asia), 1–6 (2012)

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.