Open Access
Issue
MATEC Web of Conferences
Volume 22, 2015
International Conference on Engineering Technology and Application (ICETA 2015)
Article Number 02030
Number of page(s) 7
Section Electric and Electronic Engineering
DOI https://doi.org/10.1051/matecconf/20152202030
Published online 09 July 2015
  1. Song Lianjun. & Xu Zhiyong. 2009. Power Grid Project Post Evaluation Research – Based on Improved Fuzzy Analytic Hierarchy Process. Technologic Economics, 28 (10): 522. [Google Scholar]
  2. Li Dongwei, Zhao HuiRu. & Wang Xin. 2006. Discussion on the Benefit Post Evaluation Method of Public Network Transmission and Distribution Project. Electric Power Technologic Economics, 18(6): 226. [Google Scholar]
  3. Zheng Yan. 2006. Electric Power Investment Project Post Evaluation Research and Application. Beijing: North China Electric Power University. [Google Scholar]
  4. Gan Deyi, Zhang Yuanmin & Zeng Ming. 2009. Technology Research on Optimization Method of Power Grid Construction project Investment. Reformation & Strategy, 25(5): 612. [Google Scholar]
  5. Chang Yan, Chen Wu. & Zhao Gang. 2012. Quantitative Analysis Technique and Model of Power Grid Investment Decision - Empirical Prediction Based on Dynamic Programming Method; Technologic Economics; Phase 02. [Google Scholar]
  6. Li Huaizu. 2005. Production Planning and Control (Revised Edition). Beijing: China Science and Technology Press. [Google Scholar]
  7. Li Youyi. & Chen Xueguang. 2004. Multi-objective Fuzzy Optimization Decision on the Enterprise Investment Program. Scientific-technical Progress and Countermeasure, 3: 103–104. [Google Scholar]
  8. Wei Shixiao. & Zhou Xianzhong.1998. Multi-attribute Decision-theoretic Approach and Its Application in C3I System. National Defense Industry Press, First Edition, January: 19–45. [Google Scholar]
  9. Chen Shizong, Lai Bangchuan. & Chen Xiaohong. 2005. Enterprise Performance Evaluation Method Based on DEA, Systems Engineering, 23 (6): 99–104. [Google Scholar]
  10. He Wan, Wang Dan. & Lu Gang. 2012. Balance Optimization Analysis Research of Comprehensive Planning of Power Grid Enterprise Based on Bi-objective Programming. Industrial Technology Economics, (6): 63–67. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.