Issue |
MATEC Web of Conferences
Volume 22, 2015
International Conference on Engineering Technology and Application (ICETA 2015)
|
|
---|---|---|
Article Number | 02030 | |
Number of page(s) | 7 | |
Section | Electric and Electronic Engineering | |
DOI | https://doi.org/10.1051/matecconf/20152202030 | |
Published online | 09 July 2015 |
Decision Model Research on Engineering Project Arrangement of Power Grid Enterprise Group Based on Input and Output Efficiency Evaluation
Department of Management Consulting, State Grid Energy Research Institute, Beijing, China
* Corresponding author: lugang@sgeri.sgcc.com.cn
The engineering project arrangement of a large-scale Power Grid Enterprise Group confronts optimization problems on how to achieve efficient investment, how to achieve overall balance. This paper presents a general analytical framework, and establishes appropriate quantitative analysis models from the development of general control scale, input and output efficiency evaluation, index optimization of engineering project input of a single subsidiary, and balance optimization of engineering project arrangement of subordinate units of the Group, and so on. Simulated calculation examples show that this method is more practical, which can flexibly solve such problems.
Key words: Power Grid Enterprise Group / engineering project arrangement / input and output / balance optimization
© Owned by the authors, published by EDP Sciences, 2015
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.