Open Access
Issue
MATEC Web of Conferences
Volume 15, 2014
Building Surveying, Facilities Management and Engineering Conference (BSFMEC 2014)
Article Number 01025
Number of page(s) 7
DOI https://doi.org/10.1051/matecconf/20141501025
Published online 19 August 2014
  1. Anumba, C.J. Baugh, C.A., Khalfan, M.M.A., 2002. Organization Structure to Support Concurrent Engineering to Construction, Industrial Management and Data Systems, 102/5, pp. 260–270. [Google Scholar]
  2. Austin, S.A., Baldwin, A.N., Steele, J.L., 2002. Improving building design through integrated planning and control, Engineering, Construction and Architectural Management, Vol. 9 No. 3, pp. 349–58. [CrossRef] [Google Scholar]
  3. Baiden, B.K., Price, A.D.F.; and Dainty, A.J.R., 2003. Looking beyond processes: Human factors in team integration, In: D. J. Greenwood, ed.,ARCOM, Brighton. [Google Scholar]
  4. Baiden, B.K., Price, A.D.F.; and Dainty, A.R.J., 2006. The extent of team integration within construction projects, International Journal of Project Management, 24(1), 13–23. [CrossRef] [Google Scholar]
  5. Bohari, A.A.M., Mahat, N. and Kipli, K., 2012. Industrialised Building System (IBS) in Sarawak Construction Industry. International Conference on Innovation, Management and Technology Research (ICIMTR2012), Malacca, Malaysia. [Google Scholar]
  6. Bromley, S., Worthington, J., and Robinson, C., 2003. The impact of integrated Teams on the design process, London: Construction Productivity Network. [Google Scholar]
  7. Buildoffsite, 2008. Your guide to specifying Modular Buildings Maximizing value and minimizing risk Buildoffsite & BAA, London. [Google Scholar]
  8. Cornick, T. and Mather, J., 1999. Construction project teams: making them work profitably. London: Thomas Telford. [CrossRef] [Google Scholar]
  9. Dainty, A.R.J., Briscoe, G.H.; and Millett,S.J., 2001. Subcontractor perspectives on supply chain alliances. Construction Management and Economics, 19(8), 841–848. [CrossRef] [Google Scholar]
  10. Evbuomwan, N.F.O.; and Anumba, C.J., 1998. An integrated framework for concurrent life-cycle design and construction, Advances in Engineering Software, 29(7-9), 587–597. [CrossRef] [Google Scholar]
  11. Gibbs A., 1997. Focus Groups. Social research update, Issue 19 © University of Surrey, UK. [Google Scholar]
  12. IBS Roadmap 2003-2010, 2003. Construction Industry Development Board (CIDB), Kuala Lumpur. [Google Scholar]
  13. Kamar, K.A.M., Hamid, Z.A. and Dzulkalnine, N., 2012. Industrialised Building System (IBS) Construction: Measuring the Perception of Contractors in Malaysia. IEEE Business, Engineering and Industrial Application Colloquium (BEIAC). [Google Scholar]
  14. Kamara, J.M., Anumba, C.J.; and Evbuomwan, N.F.O., 2000. Establishing and processing client requirements – a key aspect of concurrent engineering in construction. Construction Engineering and Architectural Management, 7(1),15–28. [Google Scholar]
  15. Kitzinger, J., 1995. Introducing focus groups, British Medical Journal, 311: 299–302. [CrossRef] [Google Scholar]
  16. Love, P.E.D., Irani, Z., Edwards, D.J., 2004. A seamless supply chain management model for construction, Supply Chain Management: An International Journal, Vol. 9 No.1, pp.43–56. [CrossRef] [Google Scholar]
  17. Nawi, M.N.M., Lee, A., K.A.M. Kamar and Hamid, Z.A., 2012 Critical Success Factors for Improving Team Integration in IBS Construction Projects: The Malaysian Case. Malaysia Construction Research Journal (MCRJ), Vol. 10(1). [Google Scholar]
  18. Nawi, M.N.M., Lee, A., K.A.M. Kamar and Hamid, Z.A., 2011. A Critical Literature Review on The Concept of Team Integration in Industrialised Building System (IBS). Malaysia Construction Research Journal (MCRJ), Vol. 9(1). [Google Scholar]
  19. Pan, W., Gibb, A. G. F. and Dainty, A. R. J., 2005. Offsite Modern Methods of Construction in Housebuilding Perspectives and Practices of Leading UK Housebuilders in Buildoffsite Report 2005 Loughborough University, pp. 14 [Google Scholar]
  20. Powell, R.A. and Single, H.M., 1996. Focus groups. International Journal of Quality in Health Care 8(5): 499–504. [Google Scholar]
  21. Strategic Forum for Construction, 2003. The integration toolkit guide: Integrated project team, London: Strategic Forum for Construction. [Google Scholar]
  22. Thanoon, W.A.M., Peng, L.W., Kadir, M.R.A., Jaafar, M. S. and Salit, M. S., 2003. The Essential Characteristics of Industrialised Building System, Proceeding of International Conference Industrialized Building Systems, Kuala Lumpur, Malaysia. [Google Scholar]
  23. Vyse, S., 2001. Fusion: a new approach to working, London: G1axoWelleome [Google Scholar]
  24. Whittington, R, 2001.What is strategy-and does it matter? .Thomsen Learning [Google Scholar]
  25. Le-Hoai, L., Lee, Y.D. and Lee, J.Y., 2008. Delay and Cost Overruns in Vietnam Large Constructions Projects: A Comparison with Other Selected Countries: KSCE Journal of Civil Engineering, 12(6): 367–377 [Google Scholar]
  26. Abu Bakar, A.H., Awang, A., Yusof, M.Z. and Adamy, A., 2011. Strategies for Survival During Economic Downturn in Construction Industry. A survey on Construction Companies in Malaysia. World Applied Sciences Journal, 13(9): 1967–1974. [Google Scholar]
  27. Memon, H. A., Rahman, I.A., Aziz, A.A.A. and Abdullah, N.H., 2013. Using Structural Equation Modelling to Assess Effects of Construction Resource Related Factors on Cost Overrun, World Applied Sciences Journal, 21 (Mathematical Applications in Eng.): 06–15. [Google Scholar]
  28. Zakiah, P., Che, M. C. O., Ahmad, M. A. and Azizi, M., 2011. Matrix Sustainable Strategies Compatibility Analysis of Malaysia’s Sustainable Development Strategies in Three-Tier Development Plan System, World Applied Sciences Journal. 14 (Exploring Pathways to Sustainable Living in Malaysia: Solving the Current Environmental Issues): 22–30. [Google Scholar]
  29. Vasanthi, R.P and Bakar, A.H.A., 2011, The Needs for Standardisation of Document Towards an Efficient Communication in Construction Industry, World Applied Sciences Journal. 14(9): 1988–1995. [Google Scholar]
  30. Onyeizu, E.N., and A. H. Abu Bakar, 2011. The Utilisation of Inustrialised Building System in Design Innovation in Construction Industry. World Applied Sciences Journal 15(2): 205–213. [Google Scholar]
  31. Akbar, W. Bhatti, Hussain N. and Iqbal, J., 2013, Leadership Role in Integrating Knowledge Management Enablers. World Applied Sciences Journal 26(1): 55–60. [Google Scholar]
  32. Fazdliel Aswad Ibrahim, Mohd Wira Mohd Shafiei, Ilias Said and Radzi Ismail, 2013. Malaysian Housing Developers’ Readiness in Green Homes Development. World Applied Sciences Journal, 30: 221–225. [Google Scholar]
  33. Mirsaeedie L. 2012. Application of Industrialized Building Systems (IBS) in Rurall Settlements Towards Sustainability. World Applied Sciences Journal 16(5): 729–733. [Google Scholar]
  34. Nawi, M. N. M., Lee, A., Azman, M.N.A., and Kamar, K.A.M., 2014. Fragmentation Issue in Malaysian Industrialised Building System (IBS) Projects. Journal of Engineering Science & Technology (JESTEC), Vol. 9(1), 97–106. [Google Scholar]
  35. Nawi, M.N. M., Lee, A.; and Nor, K.M., 2011. Barriers to Implementation of the Industrialised Building System (IBS) in Malaysia. The Built & Human Environment Review, 4, 22–35. [Google Scholar]
  36. Saunders, M., Lewis, P. and Thornhill, A., 2007. Research methods for business students. 4th ed. Harlow: Pearson Education Ltd. [Google Scholar]
  37. Yin, R. K. (2009) Case Study Research: Design and Methods, 4th ed., California, London, SAGE. [Google Scholar]
  38. Bell, J. (1991) Doing Your Research Project. 3th ed. Buckingham, Open University Press. [Google Scholar]
  39. Mohamad, I. M. (1999) The Application of Concurrent Engineering Philosophy to the Construction Industry. Thesis PhD, Loughborough University. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.