Open Access
Issue |
MATEC Web of Conferences
Volume 15, 2014
Building Surveying, Facilities Management and Engineering Conference (BSFMEC 2014)
|
|
---|---|---|
Article Number | 01014 | |
Number of page(s) | 8 | |
DOI | https://doi.org/10.1051/matecconf/20141501014 | |
Published online | 19 August 2014 |
- Neely, A., Gregory, M. and Platts, K. (1995). Performance measurement system design: a literature review and research agenda. International Journal of Operations & Production Management, Vol. 15 No.4, pp.80–116. [Google Scholar]
- Parida, A. and Kumar, U. (2006). Maintenance Performance Measurement (MPM): Issues and Challenges. Journal of Quality in Maintenance, Vol. 12 No.3 pp.239–251. [CrossRef] [Google Scholar]
- Bititci, U., Carrie, A. and McDevitt, L. (1997). Integrated performance measurement systems: a development guide. International Journal of Operations & Management, Vol. 17 No.5, pp. 522–534. [CrossRef] [Google Scholar]
- Kagioglou, M., Cooper, R. and Aouad, G. (2001). Performance management in construction: a conceptual framework. Construction Management & Economics, 19, 85–95. [CrossRef] [Google Scholar]
- Parker, C. (2000). Performance Measurement. Work study, 49(2), 63–66. [CrossRef] [Google Scholar]
- Martinez, V. (2005). Performance measurement systems: mix effects. http://euram2005.wi.tum.de [Accessed on: 18 May 2011. [Google Scholar]
- Baldwin, A., McCaffer, R. and Osman, I. I. (2001). Project performance in a contracting organisation: Analysis, evaluation and development. Proceedings of CIB World Congress, Willington, New Zealand. [Google Scholar]
- Tangen, S. (2003). An Overview of Frequently used Performance Measures. Work Study, Vol. 52 No.7, pp. 347–354. [CrossRef] [Google Scholar]
- Amaratunga, D. (2000). Assessment of Facilities Management Performance. Property Management, Vol. 18 No. 4, pp. 258–266. [CrossRef] [Google Scholar]
- Meekings, A. (1995). Unlocking the potential of performance measurement: a practical implementation guide. Public Money and Management, Vol. 15 No. 4, p5–12 [CrossRef] [Google Scholar]
- Cain, C. T. (2004). Performance Measurement for Construction Profitability. Blackwell Publishing Ltd., Oxford [CrossRef] [Google Scholar]
- Nanni, A.J., Dixon, J.R. and Vollmann, T.E. (1992). Integrated performance measurement: management accounting to support the new manufacturing realities. Journal of Management Accounting Research, Vol. 4, pp. 1–19. [Google Scholar]
- Rouse, P. and Putterill, M., (2003). An integral framework for performance measurement. Management Decision Vol. 41 No. 8, pp. 791–805. [CrossRef] [Google Scholar]
- Tangen, S. (2002). A theoretical foundation for productivity measurement and improvement of automatic assembly systems. Licentiate thesis, The Royal Institue of Technology, Stockholm [Google Scholar]
- De Toni, A.F., Fornasier, A. Montagner, M. and Nonino, F. (2007). A performance measurement system for facility management: the case study of a medical service authority. International Journal of Productivity and Performance Management, Vol. 56, Nos. 5/6, pp. 417–435. [CrossRef] [Google Scholar]
- Rose, K.H. (1995). A performance measurement model. Quality Progress, February, pp. 63–66. [Google Scholar]
- Williams, B. (1993). What a performance!. Property Management, Vol. 11, No. 3, pp. 190–199. [Google Scholar]
- Rummler, G.A. and Brache, A.P. (1995). Improving Performance: How to Manage the White Space on the Organisation Chart. San Francisco: Jossey-Bass Publishers. [Google Scholar]
- Pintelon, L. and Van Puyvelde, F. (1997). Maintenance performance reporting systems: some experiences. Journal of Quality in Maintenance Engineering, Vol. 3 No. 1, pp.4–15 [CrossRef] [Google Scholar]
- Kennerly, M. and Neely, A. (2003). Measuring Performance in A Changing Business Environment. International Journal of Operation & Production Management, Vol. 23 No. 2, pp. 213–29 [CrossRef] [Google Scholar]
- Lingle, J. H. and Schiemann, W. A. (1996). From balanced scorecard to strategy gauge. Is measurement worth it?. Management Review, March, pp. 56–62. [Google Scholar]
- Baharum, M.R. and Pitt, M. (2009). Determining a conceptual framework for green FM intellectual capital. Journal of Facilities Management, Vol. 7 No. 4, pp. 267–282. [CrossRef] [Google Scholar]
- Becker, F. (1990). The total workplace. Van Nostrand Reinhold, New York, NY [Google Scholar]
- Amaratunga, D. and Baldry, D. (2000). Assessment of facilities management performance in higher education properties. Facilities, No. 7/8, pp. 293–301. [CrossRef] [Google Scholar]
- Hudson, M., Smart, A. and Bourne, M. (2001). Theory and practice in SME performance measurement systems. International Journal of Operations & Production Management, Vol. 21 No.8, pp. 1096–1115. [CrossRef] [Google Scholar]
- Kadefors, A. (2008). Contracting in FM: collaboration, coordination and control. Journal of Facilities Management, Vol. 6 No. 3, pp. 178–188. [CrossRef] [Google Scholar]
- Enoma, A. and Allen, S. (2007). Developing key performance indicators for airport safety and security. Facilities, Vol. 25 No. 7, pp. 296–315. [CrossRef] [Google Scholar]
- McDougall, G. and Hinks, J. (2000). Identifying priority issues in facilities management benchmarking. Facilities, Vol. 18 No. 10/11/12, pp. 427–434 [CrossRef] [Google Scholar]
- Becker, F. (1990). The total workplace. Van Nostrand Reinhold, New York, NY [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.