Open Access
Issue |
MATEC Web of Conferences
Volume 10, 2014
Building Surveying and Technology Undergraduate Conference
|
|
---|---|---|
Article Number | 04001 | |
Number of page(s) | 6 | |
Section | Industrialised Building System | |
DOI | https://doi.org/10.1051/matecconf/20141004001 | |
Published online | 19 March 2014 |
- M.R. Abdul Kadir, W.P. Lee, M.S. Jaafar, S.M. Sapuan and A.A.A. Ali, Factors Affecting Construction Labour Productivity for Malaysian Residential Projects, Journal of Structural Survey. 23 (1) (2005) 42–54 [Google Scholar]
- W.A.M, Thanoon, L.W. Peng, M.R. Abdul Kadir, M.S. Jaafar, M.S Salit, The Experiences of Malaysia and Other Countries in Industrialized Building System in Malaysia, Proceeding on IBS Seminar. UPM, Malaysia, 2003. [Google Scholar]
- R. Abdul Rashid, A Model for an Effective Implementation of the Government Technology Transfer Policy in the Malaysian Construction Industry. Unpublished PhD Thesis. The University of Reading, 1998, 52–80 [Google Scholar]
- P.C. Bruechle, Steel and Precast Concrete, the Way Forward, Master Builders Journal, 2004. [Google Scholar]
- K.S. Elliot, Off Site Prefabrication of Concrete Structures, Proceedings of the International Conference on Industrialised Building Systems IBS 2003, Kuala Lumpur, 2003. [Google Scholar]
- L. Flynn, Framing the moment, Building Design and Construction, 2001. [Google Scholar]
- K.S. Elliot, Mixed options for Precast Concrete Construction, Building Design and Construction, 2003. [Google Scholar]
- Allmon, C.T. Haas, J.D. Borcherding and P.M. Goodrum. U.S Construction Labour Productivity Trends, 1970–1998, Journal of Construction Engineering and Management, 26 (2) (2000) 97–104 [Google Scholar]
- Aramvareekul. An Analysis of Labor Productivity in the U.S Construction Industry. Unpublished PhD Thesis. The State University of New York at Buffalo, 2002, 76–95. [Google Scholar]
- Y.F. Badir, M.R. Abdul Kadir, A.H. Hashim, Industrialized Building Systems Construction in Malaysia, Journal of Architectural Engineering, 8 (1) (2002) 19–23 [Google Scholar]
- H. Nurul Azam,A.R. Hamzah, H. Mahanim, A Literature Review of the Advantages and Barriers to the Implementation of Industrialied Building System (IBS) in Construction Industry. Malaysian Construction Research Journal, 4 (1) (2009) 10–14. [Google Scholar]
- E.M. Rojas, P. Aramvareekul, Labor Productivity Drivers and Opportunities in the Construction Industry, Journal of Management in Engineering, 2 (1) (2003) 78–82 [CrossRef] [Google Scholar]
- H.R. Thomas, A.S. Sakarcan, Forecasting Labor Productivity Using Factor Model, Journal of Construction Engineering and Management, 120 (1) (1994) 228–239 [CrossRef] [Google Scholar]
- C.H. Oglesby, H.W. Parker, G.A. Howell, Productivity Improvement in Construction, McGraw-Hill Inc., Unites State of America, 1989, 5–9 [Google Scholar]
- P.F. Kaming, P.O. Olomolaiye, G.D. Holt, F.C. Harris, Factors Influencing Craftsmen’s Productivity in Indonesia, International Journal of Project Management, 15 (1) (1997) 21–30 [Google Scholar]
- P.F. Kaming, G.D. Holt, S.T. Kometa and P.O. Olomolaiye. Severity Diagnosis of Productivity Problems – A Reliability Analysis. International Journal of Project Management. 16(2): 107–113 (1998). [Google Scholar]
- A. Kazaz, S. Ulubeyli, A Different Approach to Construction Labour in Turkey: Comparative Productivity Analysis, Journal of Building and Environment, 39 (2004) 93–100. [CrossRef] [Google Scholar]
- E.C. Lim, J. Alum, Construction Productivity: Issues Encountered by Contractors in Singapore, International Journal of Project Management, 13 (1) (1995) 52–58 [Google Scholar]
- H. Mc David, Construction and Economic Development a Stimulus or Constraint in Developing Countries, Unpublished PhD Thesis, George Washington University, 1995, 45–88. [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.