Issue |
MATEC Web of Conferences
Volume 10, 2014
Building Surveying and Technology Undergraduate Conference
|
|
---|---|---|
Article Number | 04001 | |
Number of page(s) | 6 | |
Section | Industrialised Building System | |
DOI | https://doi.org/10.1051/matecconf/20141004001 | |
Published online | 19 March 2014 |
Investigation of Industrialised Building System Performance in Comparison to Conventional Construction Method
School of Housing, Building and Planning, Universiti Sains Malaysia, 11800 Penang, Malaysia
a Corresponding author: azree@usm.my
Conventional construction methods are still widely practised, although many researches have indicated that this method is less effective compared to the IBS construction method. The existence of the IBS has added to the many techniques within the construction industry. This study is aimed at making comparisons between the two construction approaches. Case studies were conducted at four sites in the state of Penang, Malaysia. Two projects were IBS-based while the remaining two deployed the conventional method of construction. Based on an analysis of the results, it can be concluded that the IBS approach has more to offer compared to the conventional method. Among these advantages are shorter construction periods, reduced overall costs, less labour needs, better site conditions and the production of higher quality components.
© Owned by the authors, published by EDP Sciences, 2014
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 2.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.