Scheduling Construction Projects Under Fuzzy Modelling of Resource Constraints
Warsaw University of Technology, Faculty of Civil Engineering, Institute of Building Engineering, Division of Production Engineering and Construction Management,
ul. Lecha Kaczyńskiego 16,
00-637 Warsaw,
Poland
*
Corresponding author: n.ibadov@il.pw.edu.pl
Paper presents the original method of construction scheduling using fuzzy sets theory. The essence of the method is to obtain an optimal construction schedule based on the solution of the fuzzy RCPS problem with flexible restrictions. The article introduces two important modifications of the considered issue. These modifications are: maximization of the degree of fulfillment of customer preferences regarding the time span of the project implementation and the contractor's preference regarding the level of use of renewable resources, for example - the level of employment of workers. The article also contains a numerical example showing the procedure for applying the described method.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.