Issue |
MATEC Web Conf.
Volume 183, 2018
12th International Conference Quality Production Improvement – QPI 2018
|
|
---|---|---|
Article Number | 03010 | |
Number of page(s) | 5 | |
Section | Quality Management | |
DOI | https://doi.org/10.1051/matecconf/201818303010 | |
Published online | 31 July 2018 |
Improvement of quality by using an integrated management system of construction processes
1
Cracow University of Technology, Mech. Eng. Department, Al. Jana Pawla II 37, 31-864 Poland
2
M.Sc. Dip. Arch., BIM Specialist, London, UK
* Corresponding author: andrzej.sobczyk@mech.pk.edu.pl
The subject of the article is the concept of an innovative integrated construction management process connecting Building Information Modelling (BIM) and construction equipment with unique control systems. It would require developing an advanced software application allowing data exchange and keeping track of costconsumption, efficiency, use of building materials, as well as many other essential parameters, which would facilitate the improvement of quality of the technological process of construction works.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.