Issue |
MATEC Web of Conferences
Volume 26, 2015
2015 3rd Asia Conference on Mechanical and Materials Engineering (ACMME 2015)
|
|
---|---|---|
Article Number | 04002 | |
Number of page(s) | 4 | |
Section | Mechatronics and Robotics | |
DOI | https://doi.org/10.1051/matecconf/20152604002 | |
Published online | 12 October 2015 |
The Analytical Review of the Condition of Heavy Class Military and Dual-Purpose Unmanned Ground Vehicle
Transport Scientific and Educational Centre, Nizhny Novgorod State Technical University, named after R.E. Alekseev, Russia
a a.n.blokhin@gmail.com
b allakoshurina@yandex.ru
c maxim.krasheninnikov@mail.ru
d blonde-o@yandex.ru
The purpose of this article is the evaluation of the actual condition of heavy (weight more than 700 kg) military robotics and dual-purpose robotics in the world. The extensive review of the world market of heavy class military unmanned ground vehicle was made. All reviewed robots are used at present time or exist like prototypes. All robots were systematized by most important technical characteristics. In the closing of article the analysis of the reviewed heavy class dual purpose UGVs are presented. Based on the analysis the conclusion about actual condition of the heavy military robotics and dual-purpose robotics was made. Also the most promising ways and tendencies of development are representeds.
© Owned by the authors, published by EDP Sciences, 2015
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.