Open Access
Issue
MATEC Web Conf.
Volume 333, 2021
The 18th Asian Pacific Confederation of Chemical Engineering Congress (APCChE 2019)
Article Number 10001
Number of page(s) 4
Section Process Safety Management and Technology
DOI https://doi.org/10.1051/matecconf/202133310001
Published online 08 January 2021
  1. Baker, J. A. III, F. L. Bowman, G. Erwin, S. Gorton, D. Hendershot, N. Leveson, S. Priest, I. Rosenthal, P. V. Tebo, D. A. Wiegmann, and L. D. Wilson; “The Report of the BP U.S. Refineries Independent Safety Review Panel,” https://www.csb.gov/assets/1/20/baker_panel_report1.pdf?13842 (2007) [Google Scholar]
  2. The Center for Chemical Process Safety; Guidelines for Risk Based Process Safety, pp. 42–67, John Wiley & Sons, Inc., New Jersey, U.S.A. (2007) [Google Scholar]
  3. The U.S. Chemical Safety Board; Investigation Report Refinery Explosion and Fire, https://www.csb.gov/bp-america-refinery-explosion/ (2007) [Google Scholar]
  4. The U.S. Chemical Safety Board; Investigation Report Catastrophic Rupture of Heat Exchanger, https://www.csb.gov/tesoro-refinery-fatal-explosion-and-fire/ (2014) [Google Scholar]
  5. The Chemical Safety Board; Investigation Report Chevron Richmond Refinery Pipe Rupture and Fire, https://www.csb.gov/chevron-refinery-fire/, (2015) [Google Scholar]
  6. The U.S. Chemical Safety Board; Investigation Report Executive Summary Drilling Rig Explosion and Fire at the Macondo Well, https://www.csb.gov/macondo-blowout-and-explosion/ (2016a) [Google Scholar]
  7. The U.S. Chemical Safety Board; Case Study Tesoro Martinez Refinery, https://www.csb.gov/tesoro-martinez-sulfuric-acid-spill/ (2016b) [Google Scholar]
  8. The U.S. Chemical Safety Board; Case Study Williams Geismer Olefin Plant, https://www.csb.gov/williams-olefins-plant-explosion-and-fire-/ (2016c) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.