Open Access
Issue
MATEC Web Conf.
Volume 270, 2019
The 2nd Conference for Civil Engineering Research Networks (ConCERN-2 2018)
Article Number 05001
Number of page(s) 6
Section Construction Engineering and Management
DOI https://doi.org/10.1051/matecconf/201927005001
Published online 22 February 2019
  1. Bappenas, Rencana Pembangunan Jangka Menengah 2015-2019 (2014) [Google Scholar]
  2. I. Mahani, R. Z. Tamin, Perbandingan construction grant dan Minimum Revenue Guarantee (MRG), Prosiding Seminar Nasional Teknik Sipil IX-2015, 663-670 (2015) [Google Scholar]
  3. I. Mahani, R. Z. Tamin, Dukungan non kontijen untuk meningkatkan kelayakan finansial jalan tol di Indonesia, Prosiding Konferensi Nasional Pascasarjana Teknik Sipil 2016, III - 10- 18 (2016) [Google Scholar]
  4. PMK No. 223/PMK/2012 tentang Pemberian Dukungan Kelayakan Atas Sebagian Biaya Konstruksi Pada Proyek Kerjasama Pemerintah Dengan badan Usaha [Google Scholar]
  5. PMK 143/2013 tentang Panduan Pemberian Dukungan Kelayakan Atas Sebagian Biaya Konstruksi Pada Proyek Kerjasama Pemerintah Dengan badan Usaha [Google Scholar]
  6. PMK 170/2015 tentang Perubahan PMK No 143/2013 tentang Panduan Pemberian Dukungan Kelayakan Atas Sebagian Biaya Konstruksi Pada Proyek Kerjasama Pemerintah Dengan badan Usaha [Google Scholar]
  7. Perpres No..38 tahun 2015 tentang Kerjasama Pemerintah Dengan Badan Usaha Dalam Penyediaan Infrastruktur [Google Scholar]
  8. I. Mahani, R. Z. Tamin, Kajian alternatif dukungan pemerintah pada jalan tol yang tidak layak secara finansial di Indonesia, Prosiding Konferensi Nasional Pascasarjana Teknik Sipil 2013, 434-442 (2013) [Google Scholar]
  9. I. Mahani, R. Z. Tamin, Kajian penerapan kebijakan dukungan kelayakan (Viability Gap Funding), Prosiding Kolokium Jalan dan Jembatan 2015, IV- 45-51 (2015) [Google Scholar]
  10. Ministry of Finance Government of Pakistan: Draft Guidlines on Viability Gap Funds for PPP Project (2007) [Google Scholar]
  11. Deulkar WN dan Shaikh AF (2013): Viability Gap Funding Scheme For Infrastructural Development, Int.Jurnal Structural & Civil Engineering Research, Vol 2 No.4 No.V [Google Scholar]
  12. Ministry of Finance: Dukungan Kelayakan Proyek Kerjasama (VGF) (2013) [Google Scholar]
  13. K.R. Molenaar, J.E. Deekman, D.B. Ashley: Risk Assessment & Allocation for Highway Construction Management, FHWA October (2006) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.