Open Access
Issue |
MATEC Web Conf.
Volume 267, 2019
2018 2nd AASRI International Conference on Intelligent Systems and Control (ISC 2018)
|
|
---|---|---|
Article Number | 02002 | |
Number of page(s) | 6 | |
Section | Computer Science and Information Engineering | |
DOI | https://doi.org/10.1051/matecconf/201926702002 | |
Published online | 11 February 2019 |
- Li Haiming, Application of BIM technical system standard in green public building design [J]. CAS. 11, (2016). [Google Scholar]
- Gu Jinrong, Application of BIM technology in green public building design [J]. Jiangxi building materials. 13, (2017). [Google Scholar]
- Zhang Li, Application of BIM technology in green public building design [J]. Building materials and decoration. 19, (2016). [Google Scholar]
- Liu Shihua, application research of BIM based virtual construction technology [D]. master's thesis of Xi'an university of architecture and technology, 65-70 (2012). [Google Scholar]
- Xu Xiaoli, Application of BIM technology in engineering project construction [J]. New technology and new products in China. 9, (2018). [Google Scholar]
- Huang Cheng, Yang Huanyun, Peng Hexin, Gao changgui, Pan Jiaqi. Simple analysis of application of BIM technology in construction simulation optimization [J]. Enterprise technology and development. 3, (2018). [Google Scholar]
- Chen Huiqun. Analysis and research on the application of BIM technology in construction [J]. Residential industry. 5, (2018). [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.