Open Access
Issue
MATEC Web Conf.
Volume 266, 2019
International Conference on Built Environment and Engineering 2018 - “Enhancing Construction Industry Through IR4.0” (IConBEE2018)
Article Number 03019
Number of page(s) 6
Section Organization Management (OM)
DOI https://doi.org/10.1051/matecconf/201926603019
Published online 20 February 2019
  1. A. Alashwal, and K. Prizada, Venturing into international construction project: Malaysian Perspective. Global Journal of Business and Social Science Review. January-March 2015. 1 (2): 616-630 (2015). [Google Scholar]
  2. S. C. Loo, & H. Abdul-rahman, Malaysian Contractors in Gulf Construction : A Preliminary Study on Financial and Economic Risks. IACSIT International Journal of Engineering and Technology, 4(4), pp 437-441 (2012). [CrossRef] [Google Scholar]
  3. Z. Abu Bakar, Challenges face by Malaysian contractors in international ventures. Multiversity Terminology Malaysia: Master of Science (2008). [Google Scholar]
  4. W. Lu, H. Li, L. Shen, & T. Huang. Strengths, Weaknesses, Opportunities, and Threats Analysis of Chinese Construction Companies in the Global Market, Journal of Management in Engineering, vol 25, no. 4, pp. 166-176 (2009). [CrossRef] [Google Scholar]
  5. N. K. Mustaffa,. H. Adnan, & M. Z. Zakaria, Entry strategies for Malaysian Construction Related Companies Going Abroad. Australian Journal of Basic and Applied Sciences. 2012. 6 (6): 323-330 (2012) [Google Scholar]
  6. I. H. Hasan, Malaysian contractor job overseas worth USD 25.2 billion. Kuwait News Agency (2008). [Google Scholar]
  7. C. M. Mat Isa, H. M. Saman, & C. N. Preece, Determining significant factors influencing Malaysian construction business performance in international markets. Journal of Construction in Developing Countries, 20 (2): 1-23 (2015). [Google Scholar]
  8. C. M. Mat Isa, H. Adnan, and I. R. Endut, Malaysian contractors’ opinions towards international market expansion. In International Conference in the Built Environment in the 21st Century (ICiBE2006). Vol. 1. Kuala Lumpur, 13-15 June, 287-298 (2006). [Google Scholar]
  9. C. N. Preece, C. K. I. C. Ibrahim, C. M. Mat Isa, & H. M. Saman, Development of entry location, entry timing and entry mode decision model for construction firms in international markets. Construction Management and Economics, 2015. College of Engineering, Abu Dhabi University, United Arab Emirates (2015), [Google Scholar]
  10. R. Korsakienė, Internationalization of construction firms: what strategy do they follow?’ Entrepreneurship and Sustainability Issues 1 (2): 99-107 (2013). [CrossRef] [Google Scholar]
  11. P. Wong. Winds of Change: Ensuring Malaysian Builders Win In the Global Race, Master Builder Association, Malaysia (2007). [Google Scholar]
  12. W. S. Han, A. M. Yusof, S. Ismail, & N. C. Aun. Reviewing the Notions of Construction Project Success. International Journal of Business and Management. vol. 7, No. 1; pp 90-101 (2012). [Google Scholar]
  13. S. Kerur, & W. Marshall. Identifying and managing risk in international construction projects. International Review of Law (2012). [Google Scholar]
  14. G. M. Gad. Effect of culture, risk, and trust on the selection of dispute resolution methods in international construction contracts. Iowa State University: Graduate Theses and Dissertations. (2012). [Google Scholar]
  15. I. Abe, The impact of contractors’ pre-qualification on construction project delivery in Nigeria Engineering, Construction and Architectural Management. 19 (2): 159-172 (2012). [Google Scholar]
  16. Construction Industry Development Board. Buku Keperluan dan Prosedur Pendaftaran Kontraktor. m.s 49. CIDB (2015) [Google Scholar]
  17. N. A. Jatarona, A. M. Yusof, S. Ismail, & C. C. Saar, Public construction projects performance in Malaysia, Journal of Southeast Asian Research, Vol. 2016 (2016), pp.1-7 (2016) [CrossRef] [Google Scholar]
  18. C. M. Mat Isa, H. M. Saman, & S. R. M. Nasir, (2013). Specific factors influencing market selection decision by Malaysian construction firms into international market. International Conference on Innovation, Management and Technology Research. 22-23 September 2013. Elsevier Ltd.: Social and Behavioral Science 129, 4-10 (2013) [Google Scholar]
  19. C. F. Fernández, B. G. Cantó, & C. G. Pastor, Internationalization of the construction sector: AEC application software. 1ST World Engineering Education Flash Week Lisbon (2011). [Google Scholar]
  20. F. Y. Y. Ling, And L. Hoi, Risks faced by Singapore Firms when Undertaking Construction Projects in India. International Journal of Project Management 24. pp 261–270 (2006) [CrossRef] [Google Scholar]
  21. C. M. Mat Isa, H. M. Saman, A, Jaapar. & S. R. M. Nasir, Linking Entry Timing (ET) and Entry Mode (EM) Decisions in International Market Expansion by Malaysian Construction Firm: Toward the Development of ETEM Model. Proceedings of the 1st AAGBS International Conference on Business Management 2014 (AiCoBM 2014), pp.79-92 (2014) [Google Scholar]
  22. T. Ma, & M. A. Voo, Comparative Study of Construction Joint Ventures in Australia and Malaysia. Construction Management & Economics, School of NBE, University South Australia. (2014) [Google Scholar]
  23. M. R. Stewart, & R. D. Maughn, International Joint Ventures, A Practical Approach. The D logo, and Defining Success Together are registered trademarks of Davis Wright Tremaine LLP. (2011) [Google Scholar]
  24. S. J. Minja, G. J. Kikwasi, and W. D. Thwala, A study of joint venture formation between construction organization in Tanzania, Australasian Journal of Construction Economics and Building, Conference Series, 1 (2) 32-42 (2012) [CrossRef] [Google Scholar]
  25. C. Chen, & J. I. Messner, Permanent versus mobile entry decisions in international construction markets: Influence of home country - and firm-related factors. Journal of Management in Engineering, (January), 2-12 (2011) [CrossRef] [Google Scholar]
  26. C. Y. J. Cheah, & M. J. Garvin, An open framework for corporate strategy in construction. Engineering, Construction and Architectural Management. Volume 11 Number 3, pp. 176-188. (2014) [CrossRef] [Google Scholar]
  27. R. V. Krejcie, & D. W. Morgan, Determining sample size for research. Educational and Psychological Measurement. pp. 607-610 (1970) [Google Scholar]
  28. C. R. Kothari, Research Methodology Methods and Techniques (Second Revised Edition). New Age International Publishers. pp 85. (2004). [Google Scholar]
  29. W.L. Neuman, Basics of Social Research: Qualitative and Quantitative Approaches. Boston: Pearson. (2012) [Google Scholar]
  30. S. B. A, Zaki, S. F. Mohamed, & Z. M Yusof,. Construction Skilled Labour Shortage - The Challenges in Malaysian Construction Sector. International Journal of Sustainable Development, vol. 4, No. 5, pp. 99-108 (2012). [Google Scholar]
  31. ILO. The Construction Industry in The Twenty First Century: Its Image, Employment Prospects and Skill Requirements, Report For Discussion at the Tripartite Meeting on Construction Industry in The Twenty First Century: Its Image, Employment Prospects and Skill Requirements. (2001). [Google Scholar]
  32. F. Y. Y. Ling, And L. Hoi, Risks faced by Singapore Firms when Undertaking Construction Projects in India. International Journal of Project Management 24. pp 261–270 (2006). [CrossRef] [Google Scholar]
  33. J. Walewski, E, Gibson. and E, Vines. Risk Identification and Assessment for International Construction Projects. ICEC International Cost Management Journal Ljubljana, Slovenia (2012) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.