  1. J. Lucas, What is civil engineering?, Live Science, (2014) [Google Scholar]
  2. Columbia University, What is civil eng.?, (2016) [Google Scholar]
  3. S. M. Vera, Diff. Between Arch., Civil Eng And Bldg Eng World Wide, (2013) [Google Scholar]
  4. R. A. Jimoh and S. M. Adama, Assessment of prelim. in relation to the total cost of renovation work in public schools in Abuja, Nigeria, in ICEC IX World Congress Assessment, 1-9, (2011) [Google Scholar]
  5. H. S. Kammer, Pricing Prelim., (2012) [Google Scholar]
  6. A. A. Abas, Z. Ismail, F. Ismail, and R. A. Arshad, Bills of Prelim. Pricing Trends for Malaysian Civil Infra. Works in Conventional Contract, (2017) [Google Scholar]
  7. H. Adnan and A. Nawawi, Bills of Quantities: Perspectives of Contractor in Malaysia., J. Appl. …, 5, 863–873, (2011) [Google Scholar]
  8. T. S. Yi, A study Into prelim. for the constr. project in Setapak, Wangsa Maju, Kuala Lumpur, (2010) [Google Scholar]
  9. H. Gebreab, ‘Tender Cost Preparation’, Academia, 11, (2016) [Google Scholar]
  10. A. A. Abas, Z. Ismail, F. Ismail, and R. A. Arshad, Cost of Prelim. of Constr. Projects for Civil Infra. Works, Sains Humanika, 9, 9–13, (2017) [Google Scholar]
  11. Turner & Townsend, Int. const. market survey 2016, (2016) [Google Scholar]
  12. K. H. Chan, Shortage of Engrs. and What That Means in Const. Disputes, Kheng Hoe Advocates, (2016) [Google Scholar]
  13. K. A. EL Nahel, What Are Prelim. in Const. Contracts? How to Use Prelim. Costs in Claims. (2014) [Google Scholar]
  14. A. A. U. S. A. U. S. Gunathilaka and L. D. I. D. I. P. Senevirathne, Common Errors That Are Being Made In Preparing And Pricing BOQ In Sri Lanka Const. Industry, in The second world construction symposium 2013: Socio-economic sustainability in construction, 20021, 93-100, (2013) [Google Scholar]
  15. T. Cunningham, The Function and Format of BQ: an Irish Context, (2016) [Google Scholar]
  16. N. A. Ghani, The importance of prelim. items, (2006) [Google Scholar]
  17. A. A. Abas, R. A. Arshad, and Z. Ismail, Challenges of Accurate Estimation in Prelim. of Constr. Projects, Adv. Sci. Lett., 23, 2970-2973(4), (2017) [CrossRef] [Google Scholar]
  18. K. Potts, Construction Cost Management: Learning from Case Studies, 28, (2008) [Google Scholar]
  19. H. Deen, The Lump Sum Const. Contract - What Seems to be the problem, (2011) [Google Scholar]
  20. A. A. Abas, Variation in Price of Prelim. in Constr. Projects During Tender Stage, (2018) [Google Scholar]
  21. S. O. Oyediran, O. M. Ajayi, and F. A. Aderinto, Cost Modeling of Prelim. for Bldg. Projects, Built Environ. J., 9, 1–8, (2012) [Google Scholar]
  22. S. K. S. Harbans, Const. Contracts: An Overview, Ing., 6-20, (2005) [Google Scholar]
  23. S. Rajoo, Standard Forms of Contract - The Malaysian Position, in Int. Bar Assoc. (IBA) Annual Conference 2014, (2014) [Google Scholar]
  24. F. Aderinto, Admin. of project prelim., Construction Week Online.com, Feb-2010 [Google Scholar]
  25. The Entrusty Group, What are Prelim. and How to Evaluate Them?, Master Build. J., 1, 80–90, (2009) [Google Scholar]
  26. A. C. Haruna, A. Mohammed, and G. S.-P. Buba, Appraising Contractors’ Perception of Pricing Prelim. of Housing Projects in Kaduna, Nigeria, FUW Trends Sci. Technol. J., 2, 1008-1012, (2017) [Google Scholar]
  27. T. C. Keng, Costing for The Prelim. Section of The Constr., in Cost and Contract Administration in Construction, Devine Perspectives, 24-29, (2016) [Google Scholar]
  28. S. Bandi, Bills of Quantities: Raison d’etre?, Academia, 2, 1–15, (2016) [Google Scholar]
  29. L. I. Yanqiu and K. E. Hong, Research on Adjustment of Prelim. Caused by New Work Sections And Trades added in list, in 2nd Int. Conference on Education Technology, Management and Humanities Science (ETMHS 2016) Research, 170-174, (2016) [Google Scholar]
  30. C. Ji, J. Mbachu, and N. Domingo, Factors Influencing the Accuracy of Pre- Contract Stage Estimation of Final Contract Price in New Zealand, Int. J. Constr. Supply Chain Manag., 4, 51–64, (2014) [Google Scholar]
  31. T. Cunningham, Contractors’ Claims for Loss and Expense under the Principle “Traditional” Forms of Irish Building Contract, 31, (2014) [Google Scholar]
  32. T. Cunningham, ARM4 - A Working Guide - Section B - Preliminaries, 0-18 (2015) [Google Scholar]
  33. M. Frazer, Australia: Early contractor involvement in preliminary design process of constr. projects, Mondaq Ltd., (2012) [Google Scholar]
  34. Trevorsadd, Prelim. (General Site Costs) A Guide to the Pricing and Use of Prelim. in the Formulation of Budgets, Quotations and Tenders, 16, (2005) [Google Scholar]
  35. S. Doran, Preliminaries and contemporary procurement, The NBS.com, (2007) [Google Scholar]
  36. R. C. Smith, Estimating and Tendering for Building Work, (2013) [Google Scholar]
  37. NJDOT, Cost Estimating Guideline, Progr. Manag. Off., 126, (2016) [Google Scholar]
  38. H. S. Shahrudin, 4 men arrested for attempting to extort RM50,000 from contractor, New Strait Times, 26-Oct-2017 [Google Scholar]
  39. E. S. M. Chin, Gangsters on mean streets, Malay Mail Online, Aug-2016 [Google Scholar]
  40. R. K. Ellsworth, Estimating indirect costs for infra. constr. projects, Construction Accounting & Taxation, 21, 11–16 (2011) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.