Issue |
MATEC Web Conf.
Volume 266, 2019
International Conference on Built Environment and Engineering 2018 - “Enhancing Construction Industry Through IR4.0” (IConBEE2018)
|
|
---|---|---|
Article Number | 01013 | |
Number of page(s) | 8 | |
Section | Sustainable Construction and Built Environment (SCBE) | |
DOI | https://doi.org/10.1051/matecconf/201926601013 | |
Published online | 20 February 2019 |
Significant Factors Affecting Civil Engineering Project Performance
Faculty of Architecture, Planning and Surveying, Universiti Teknologi MARA (UiTM), 40450, Shah Alam, Selangor
* Corresponding author: mimad856@gmail.com
Civil engineering projects trigger the economic growth by providing infrastructure facilities and job opportunities as well as attracting the attention of foreign investments. Due to their significant contributions toward the nation growth, the performance of civil engineering projects has become the upmost concern by the government. Unfortunately, many civil engineering projects in Malaysia are dominantly associated with unsatisfactory performance in terms of cost, time and quality of the delivered products. Therefore, this paper aims to identify the underlying causes which lead to unsatisfactory performance by determining the factors affecting civil engineering projects. The objective of this paper is to identify the civil engineering project characteristics and the quality of Standard Form of Contract (SFoC) adopted and the contractual behaviour of key participants of civil engineering project which affecting the performance. Questionnaires survey were conducted to undertake the research. 124 feedbacks received out of 300 questionnaires distributed to the G7 contractors registered under Construction Industry Development Board (CIDB) and consultant engineer registered under Board of Engineers Malaysia (BEM). The data was statistically analysed using SPSS 21 and descriptive analysis was used for rank assessment of factors. It was found that the top three (3) most significant factors affecting civil engineering project performance are delay in making payment, environment uncertainty and the clarity of SFoC. These factors belong to three categories i.e the contractual behaviour of key participants, project characteristics and the quality of SFoC category. Thus, these categories are paramount to be put more concern on the performance of civil engineering projects in Malaysia.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.