Open Access
Issue |
MATEC Web Conf.
Volume 266, 2019
International Conference on Built Environment and Engineering 2018 - “Enhancing Construction Industry Through IR4.0” (IConBEE2018)
|
|
---|---|---|
Article Number | 01015 | |
Number of page(s) | 7 | |
Section | Sustainable Construction and Built Environment (SCBE) | |
DOI | https://doi.org/10.1051/matecconf/201926601015 | |
Published online | 20 February 2019 |
- ADB, EBRD, IDB, IsDB, MIF, PPIAF and WBG, The APMG PPP Certification Guide - Request for proposal. [Online] Available: https://ppp-certification.com/ppp-certification-guide/3-special-characteristic-ppp-tender-process [Accessed 2016] [Google Scholar]
- E. Anders, P. Schutze, Organizing and Financing of Public Infrastructure Projects. A path to Economic Growth and Development of the Danish Welfare Model- Main Report. Public Private Partnerships Copenhagen [Accessed May 15, 2013] [Google Scholar]
- M. Ahadzi, G. Bowles, The Private Finance Initiative: The Procurement Process in Perspective”. Proceedings of the 17th Annual Conference of ARCOM, Salford, 2001 pp. 971-980 [Google Scholar]
- A. Akintoye, M. Beck and C. Hardcastle, Public Private Partnerships - Managing Risks and Opportunities. Blackwell Publishing, 2003 [CrossRef] [Google Scholar]
- A. Akintoye, C. Hardcastle, M. Beck, E. Chinyio, and D. Asenova, Achieving best value in private finance initiative project procurement. Construction Management and Economics, vol. 21, pp. 461-470, 2003. [Google Scholar]
- K. Beeston, Is the price is right? PFI Journal. [Online].Available: www.cbi.org.uk [Accessed January 20, (2007) [Google Scholar]
- J. Birnie, Risk Allocation to the Construction Firm within a Private Finance Initiative (PFI) Project. ARCOM Conference Proceedings, 1997. pp. 527-534 [Google Scholar]
- N. Carbonara, L. Gunnigan, R.and F. Sciancalepore, Tendering Procedures in PPP: A literature review. School of Surveying and Construction Managament, Dublin Institute of Technology ARROW@DIT, 2012. [Google Scholar]
- Deloitte, Government and public sector-building flexibility-New delivery models for public infrastructure projects, 2006 [Google Scholar]
- I. Demirag, M. Dubnick, and M. Khadaroo, A framework for examining accountability and value for money in the UKs private finance initiative. Greenleaf Publishing. Autumn, 2004. [Google Scholar]
- T. Dixon, G. Pottinger and Jordon, A lesson from the private finance initiative in the UK: Benefit, problems and critical success factor. Journal of property investment and finance, 23 (5), pp. 412-423, 2015. [CrossRef] [Google Scholar]
- N. Doni, A Comparison of Alternative Procedures for the Selection of the Private Partner in PPP Projects. Working Paper Università degli Studi di Firenze., 2007. [Google Scholar]
- Economic Planning Unit, Ninth Malaysia Plan 2006-2010. EPU, Malaysia., Feb 15 2007, [Online]. Available: http://www.epu.jpm.my/rm9/english/chapter10/pdf [Accessed 2006] [Google Scholar]
- I. R. Endut, Framework for minimizing time overruns of Malaysia construction projects. A Ph.D. Thesis, Glasgow Caledonian University, 2008. [Google Scholar]
- E. E.Endicott, PFI: A step in the right direction. PFI Journal., 2001 [Online] Available :15 January 2007, www.frost.com from the World Wide Web[Accessed, 2001] [Google Scholar]
- C. Hardcastle, The private finance initiative - friend or foe. Glasgow Caledonian University, Scotland UK, 2006. [Google Scholar]
- HM Treasury,. PFI: Meeting the investment challenge. HMSO London, 2003 [Online] Available: http://www.hm-treasury.gov.uk/media/648B2/PFI_604.pdf [Accessed February 14,2007] [Google Scholar]
- H. K. Yong, Public-Private Partnerships Policy and Practice. A reference guide.Commonwealth Secretariat, ISBN:978-84929-020-3, 2010. [Google Scholar]
- HM Treasury, PFI: Strengthening long-term partnerships. HMSO, London, 2006 [Online] Abvailable. http://www.hm-treaury.gov.uk/media/IEI/33/bud06_pfi_618.pdf [Accessed December 10,2006] [Google Scholar]
- B. Li, A. Akintoye, P. P. Edwards and C. Hardcastle, Critical success factors for PPP/PFI Projects in the UK construction industry. Construction Mgt. & Economic. June 23,2005, pp. 459–471 [CrossRef] [Google Scholar]
- NAO, Improving the PFI tendering process. Report by the Controller and Auditor General. HC 149 Seesion 2006-2007, 2006. [Google Scholar]
- S. Nurfarhana, Tendering Strategies in Winning PFI Contract. Unpublished Degree Thesis. University Teknologi MARA, Shah Alam, 2015. [Google Scholar]
- S. Saidan Khaderi, Private Finance Initiative (PFI) Implementation in pre-construction stage. Unpublished Ph.D. Thesis. University Sains Malaysia, 2011. [Google Scholar]
- S. Saidan Khaderi and A. R. Abdul Aziz A R, Adoption of PFI in Malaysian public works projects: Are we ready? CIB World Congress 2010, Salford University UK, 2010. [Google Scholar]
- S. Saussier, C. Staropoli, A. Yvrande-Billon, Public-Private Agreements, Institutions, and Competition: When Economic Theory Meets Facts, Review of Industrial Organization, Vol. 35, pp. 1-18, 2009. [Google Scholar]
- S. K. Shamsida and A. S. Ani Saifuza, Innovative Implementation of PFI Procurement Challenges and Key Issues in Pre-Construction Stage. 7th Asian Conference on Environment Behaviour Studies, National Taiwan University Taipei, Taiwan. 9-10 April 2016. [Google Scholar]
- R. L. K. Tiong, J. Alum, Evaluation of proposal for BOT projects, International Journal of Project Management, vol. 15, No. 2, pp. 67-72, 1997. [CrossRef] [Google Scholar]
- N. T. To, K. Ozawa, Evaluation of procurement system for BOT infrastructure in Asian Countries. Proceedings of the International Symposium on Social Management, Hubai China 9-11 March, Hubai China, 2007. [Google Scholar]
- UKAS (Unit Kerjasama Awam Swasta)/ 3PU PPP Guidelines, 2009 [Online] Available : http://www.ukas.gov.my/en/garis-panduan-ppp [Google Scholar]
- UKAS (Unit Kerjasama Awam Swasta)/ 3PU, End to End Process - PPP Guidelines., 2010 [Online] Available: http://www.ukas.gov.my/en/end-to-eprocessPPPGuidelines. [Google Scholar]
- Construction Industry Council. Contractors’ Key Guide to PFI, 1998. [Google Scholar]
- Great Britain Parliament : House of Commons. Private Finance Initiative (PFI). Seventeenth Report of Session 2010-12 vol. 1, 2010. [Google Scholar]
- NAO. Private Finance Initiative - Construction Performances. National Audit Office, 2003. [Google Scholar]
- I. Syuhaida & M.D. Aminah. The provision of infrastructure via PFI - Theoritical and Empirical. Research in Urban Management. Special Number 15/April, 2009. [Google Scholar]
- A. Merna & M. Owen. The Private Finance Initiative. Centre for research into the Management of Projects, UMIST, 1999. [Google Scholar]
- M. Ahadzi and G. Bowles. The PFI : The new procurement process in perspective. ArCoM Proceedings, 2004. [Google Scholar]
- R. Takim, I. Kharizam and R. Abdul Rahman. The acceptability of PFI Scheme in Malaysia. Asian Social Science. Vol. 4 (12), pp 71-82, 2009. [Google Scholar]
- The Edge. Untested model for Malaysian companies, The Edge Malaysia, pp 75, 2006. [Google Scholar]
- I. Abdul Rahman, H.M. Aftab and M.Z. Nora Sheda. Public private Partnerships procurement methods in Malaysia construction industry. Journal of American Science, 10 (7) : pp 91-97, 2014. [Google Scholar]
- J. Broadbent and R.C. Laughlin. Public Private Partnerships introduction. Accounting Auditing & Accountibility Journal, 16 (3): pp 332-341, August, 2003. [CrossRef] [Google Scholar]
- D. Wang and D. Dai. Research on concessionnaire selection for BOT projects. Proceeding of International Conference on Management & Service Science (MASS), Wuhan (China), 24-26 August, 2010. [Google Scholar]
- R.L.K. Tiong and J. Alum. Evaluation of proposal for BOT Projects. International Journal of Project Management Vol. 15, No. 3, pp 67-72, 1997. [CrossRef] [Google Scholar]
- N.A.W.A. Zawawi, M. Ahmad, A.A. Umar, M.F. Khamidi & A. Idrus. Financing PF2 Projects : Opportunities for Islamic Project Finance. Procedia Engineering 77, pp 179-187, 2014. [CrossRef] [Google Scholar]
- Y.H. Kwak, Y.Y. Chih & C.W. Ibbs. Towards a Comprehensive Understanding of PPP for Infrastructure Development. California Development Review, 51 (2), pp 52-78, 2009. [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.