Issue |
MATEC Web Conf.
Volume 66, 2016
The 4th International Building Control Conference 2016 (IBCC 2016)
|
|
---|---|---|
Article Number | 00014 | |
Number of page(s) | 7 | |
DOI | https://doi.org/10.1051/matecconf/20166600014 | |
Published online | 13 July 2016 |
Public Private Partnership Benefits in Delivering Public Facilities in Malaysia
1 Centre for Real Estate Studies, Universiti Teknologi Malaysia, 81310 UTM Johor Bahru, Johor, Malaysia
2 Faculty of Geoinformation and Real Estate, Universiti Teknologi Malaysia, 81310 UTM Johor Bahru, Johor, Malaysia
a Corresponding author: maimunahsapri@utm.my
The development of infrastructure in developing country such as Malaysia was increasingly founded by the Public–Private Partnership (PPP) scheme. Collaboration with private sector has become popular as a means to improve the delivery of public facilities. Yet, empirical evidence on how PPP initiative has benefits the delivery of public facilities within Malaysia context is lagging. The purpose of this paper is to identify and assess the perception of stakeholders on the benefits of adopting PPP in delivering public facilities in Malaysia. Literature review was carried out to identify PPP benefits, which were then incorporated into the questionnaire. The mean score and mean score ranking was conducted to assess the agreement level of stakeholders towards the PPP benefits. The overall findings show that the implementation of PPP has benefitted the delivery of public facilities in both financial and non-financial aspects. From the analysis, improvement in service quality is perceived as the top advantage followed by innovation in design and transfer of risk. The findings provide more informed basis on the rationale of PPP implementation and its potential in improving the delivery of public facilities within Malaysia context.
© Owned by the authors, published by EDP Sciences, 2016
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.