Open Access
Issue |
MATEC Web Conf.
Volume 234, 2018
BulTrans-2018 – 10th International Scientific Conference on Aeronautics, Automotive and Railway Engineering and Technologies
|
|
---|---|---|
Article Number | 05001 | |
Number of page(s) | 6 | |
Section | Railway Engineering and Technologies | |
DOI | https://doi.org/10.1051/matecconf/201823405001 | |
Published online | 21 November 2018 |
- F. Corman, S. Kraijema, M. Godjevac, F. Lodewijks, Optimizing preventive maintenance policy: A datadriven application for a light rail braking system, Journal of Risk and Reliability, 231, 534–545 (2017) [Google Scholar]
- J. Vatn, T. Aven, An approach to maintenance optimization where safety issues are important, Reliability Engineering and System Safety, 95, 58–63 (2010) [CrossRef] [Google Scholar]
- M. Wolde, A. Ghobbar, Optimizing inspection intervals - Reliability and availability in terms of a cost model: A case study on railway carriers, Reliability Engineering and System Safety, 114, 137–147 (2013) [CrossRef] [Google Scholar]
- M. Babeł, M. Szkoda, Diesel locomotive efficiency and reliability improvement as a result of power unit load control system modernization, Eksploatacja i Niezawodnosc - Maintenance and Reliability, 18, 38–49 (2016) [CrossRef] [Google Scholar]
- Life Cycle Cost (LCC) analysis of a ST48 15D/A diesel locomotive. Paper No. M-8/494/2015/P, Cracow University of Technology, Institute of Rail Vehicles, Krakow (July 2015) [Google Scholar]
- Life Cycle Cost (LCC) analysis of a 19WE rail set. Paper No. M-8/10/2009/1, Cracow University of Technology, Institute of Rail Vehicles, Krakow (March 2009) [Google Scholar]
- Optimisation of the plan of maintenance of SM42 diesel locomotives operated by CTL Logistics Sp. z o.o. Paper No. M-8/160/2016/P, Cracow University of Technology, Institute of Rail Vehicles, Krakow (May 2016) [Google Scholar]
- Optimisation of the plan of maintenance of 440Ra cistern wagons operated by CTL Logistics Sp. z o.o. Paper No. M-8/220/2016/P, Cracow University of Technology, Institute of Rail Vehicles, Krakow (May 2016) [Google Scholar]
- Optimisation of the plan of maintenance of ET22 electric locomotives operated by CTL Logistics Sp. z o.o. Paper No. M-8/509/2016/P, Cracow University of Technology, Institute of Rail Vehicles, Krakow (October 2016) [Google Scholar]
- Optimisation of the plan of maintenance of 418V selfdischarging wagons operated by owned by CTL Maczki-Bór S.A. Paper No. M-8/543/2017/P, Cracow University of Technology, Institute of Rail Vehicles, Krakow (June 2017) [Google Scholar]
- Analysis of the possibility of timely extension of the operating time of the P4 and P5 maintenance levels of the freight wagons of the Eas, Eaos and Eanos series. Paper No. M8/80/2014/P, Cracow University of Technology, Institute of Rail Vehicles, Krakow (2014) [Google Scholar]
- Technical expertise on the possibility of introducing changes to the current inspection and repair cycle for repairs carried out at the fourth maintenance level of the ET22 modernised locomotive type 201Ek. Paper No. M-8/449/2016/P, Cracow University of Technology, Institute of Rail Vehicles, Krakow (2016) [Google Scholar]
- Technical expertise to unify the existing maintenance plan in therms of P3, P4 and P5 levels of the modrnised traction vehicles ST45 type 301Dd and ST46 type 303 Da together with the appraisal and assessment of the risk. Paper No. M-8/629/2015/P, Cracow University of Technology, Institute of Rail Vehicles, Krakow (2015) [Google Scholar]
- M. Szkoda, Shaping the carrying potential of railway transport companies, Wydawnictwo Politechniki Krakowskiej, Krakow (2017) [Google Scholar]
- Strategy for the maintenance at the P1 maintenance level of SM42 modernised diesel locomotives (6Dg, 6Dg/A, 6Dg/B types). Feasibility study. Paper No. M-8/494/2014/P, Cracow University of Technology, Institute of Rail Vehicles, Krakow (May 2014) [Google Scholar]
- Technical opinion on the possibility to change the maintenance plan as regards the P2 level of SM42 diesel locomotives of the 6Dg, 6Dg/A, 6Dg/B types together with the appraisal and assessment of the risk. Report of a research body on the assessment of safety. Paper No. M-8/410/2014/P, Cracow University of Technology, Institute of Rail Vehicles, Krakow (July 2014) [Google Scholar]
- Technical opinion on the possibility to change the maintenance plan as regards P3 and P4 levels of SM42 diesel locomotives of 6Dg, 6Dg/A, 6Dg/B and 6Dk types together with the appraisal and assessment of the risk. Report of a research body on the assessment of risk permissibility. Paper No. M-8/236/2015/P, Cracow University of Technology, Institute of Rail Vehicles, Krakow (2015) [Google Scholar]
- G. Kaczor, M. Szkoda, Reliability and availability assessment of diesel locomotive using Fault Tree Analysis, Archives of Transport, 40, 79–89 (2016) [Google Scholar]
- M. Szkoda, G. Kaczor, Application of fault tree analysis for reliability and availability assessment of the rolling stock, The 11th World Congress on Railway Research WCRR 2016, Milano, Italy (2016) [Google Scholar]
- ReliaSoft Corporation: System analysis reference: reliability, availability & optimization, ReliaSoft Publishing, Tucson, AZ (2009) [Google Scholar]
- A. Kadziński, Study on selected dependability aspects of systems and rail vehicles objects, Wydawnictwo Politechniki Poznańskiej, Poznan (2013) [Google Scholar]
- R. Manzini, A. Regattieri, H. Pham, E. Ferrari, Maintenance for Industrial Systems, (Springer, 2010) [CrossRef] [Google Scholar]
- Commission implementing regulation (EU) No 402/2013 of 30 April 2013 on the common safety method for risk evaluation and assessment and repealing Regulation (EC) No 352/2009 (L 121/8, 3 May 2013) [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.