Open Access
Issue |
MATEC Web Conf.
Volume 221, 2018
2018 3rd International Conference on Design and Manufacturing Engineering (ICDME 2018)
|
|
---|---|---|
Article Number | 01006 | |
Number of page(s) | 4 | |
Section | Functional Material Design and Analysis | |
DOI | https://doi.org/10.1051/matecconf/201822101006 | |
Published online | 29 October 2018 |
- J. Gavin, J. Lasalle, jll’s Year in Review report for UAE – JLL MENA, (2017). http://www.jll-mena.com/mena/en-gb/research/397/jll-2017-year-in-review-report-for-uae [Google Scholar]
- https://government.ae/en/about-the-uae/the-uae.../the-federal-national-council- [Google Scholar]
- J. Eyre, R. Hart, G. Connolly. Optimising delivery solutions for social & affordable housing, Abu Dhabi, UAE. Al Falah Community Project, a social housing case study (2004). Available on (www.conference.net.au/cibwbc13/papers/cibwbc2013_submission_35.pdf) [Google Scholar]
- S. Kumar, “Precast Take the Lead”. (2011). Available from <http://www.constructionweekonline.com/article-17403-precast-takes-the-lead/> (accessed 13 Feb. 2018). [Google Scholar]
- https://www.upc.gov.ae/en/publications/...guidelines/pearl-rating-manual-estidama [Google Scholar]
- Abu Dhabi Municipality, Permit Department. https://www.abudhabi.ae/portal/public/en/departments/adm [Google Scholar]
- B. Bell, “Topocast, Parametric Precast”. Available from <http://topocastlab.com/portfolio/parametric-precast/>> (accessed 7 Feb. 2018). [Google Scholar]
- B. Mohamed, M. Elkaftangui, R. Zureikat. “Towards Rethinking the Precast Concrete Industry in the UAE”, Learning prototyping and Adapting, CADRIA 2018, pp287–296. [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.