Open Access
Issue
MATEC Web Conf.
Volume 177, 2018
The 5th International Seminar on Ocean and Coastal Engineering, Environmental and Natural Disaster Management (ISOCEEN 2017)
Article Number 01028
Number of page(s) 7
DOI https://doi.org/10.1051/matecconf/201817701028
Published online 04 July 2018
  1. A. Wulandari, Analisa Peningkatan Kualitas Layanan Jasa Reparasi Kapal di Galangan Kapal Jawa Timur. 2016, Institut Teknologi Sepuluh Nopember: Surabaya. [Google Scholar]
  2. F.F. Clifford, Erik, W. L., Manajemen Proyek: Proses Manajerial. 2007: Andi Publisher, Yogyakarta. [Google Scholar]
  3. M. Aulady, Orleans, C., Perbandingan Durasi Waktu Proyek Konstruksi Antara Metode Critical Path Method (CPM) dengan Metode Critical Chain Project Management (Studi Kasus: Proyek Pembangunan Apartemen Menara Rungkut). Jurnal IPTEK Institut Teknologi Adhi Tama, 2016. 20: p. 14-18. [Google Scholar]
  4. A. N. Andr., Optimalisasi Penjadwalan Proyek pada Pembangunan Gedung Khusus Laboratorium Stasiun Karantina Ikan Kelas 1 Tanjung Emas Semarang. 2007, Universitas Negeri Semarang. [Google Scholar]
  5. A. Arinto., Exploring Bar Chart Method, CPM, PDM, PERT, Line of Balance, and Time Chainage Diagram in Project Scheduling Construction. 2010, Diponegoro University: Semarang. [Google Scholar]
  6. Silvianita., N., A., Mulyadi, Y., Suntoyo., Chamelia, D. M Project Scheduling Based on Risk of Gas Transmission Pipe. in IOP Conference Series: Earth and Environmental Science. 2018. [Google Scholar]
  7. Silvianita., F., R., Rosyid, D. M., Suntoyo., Chamelia, D. M. Fast Missile Boat Project Planning using CPM and What If Analysis Method. in IOP Conference Series: Earth and Environmental Science. 2018. [Google Scholar]
  8. Silvianita, A.N.S., Daniel M Rosyid. Project Delay Analysis of HRSG. 2017: IOP Conference Series: Earth and Environmental Science. [Google Scholar]
  9. J. S. Young, J.H.W., Jong Gye Shin, Research on a Simulation Based Ship Production Support System for Middle Sized Shipbuilding Companies. International Journal Naval Architec Ocean Engineering, 2009. 1: p. 70-77. [CrossRef] [Google Scholar]
  10. D. Alfianto., Evaluasi Penjadwalan Proyek dengan Menggunakan Metode CPM dan Analisis Kurva S pada Proyek Studi Detail Desain Pantai Les Tejakula di Kab Buleleng Bali. 2012, Universitas Pembangunan Nasional Veteran. [Google Scholar]
  11. H. Gitosudarmo., Indriyo, Sistem Perencanaan dan Pengendalian Produksi, ed. E. 2. 2000, Yogyakarta: BPFE UGM. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.