Development progress monitoring system in Engineering Procurement Construction (EPC) company with Earn Value Analysis (EVA) approach based on web mobile
Management Engineering, Industrial Engineering Department, 60119 Surabaya, Indonesia
*
Corresponding author: srhadityo@yahoo.com
At the time, development of technology and system information provide an idea in project management information system. One of industrial which growing up in Indonesia is Engineering Procurement and Construction (EPC), in this case required a system to facilitate between all stakeholders to improve their performance. Progress report on the project that was created approach using earn value analysis (EVA) system which considered cost and schedule of work as well as a productivity performance index of workers. In addition, project progress was formed by comparing between plans and realization of work which has projected since of the beginning of the project. The result on the system was provides information of progress every time through on the dashboard page input by the user. The first step of making a report on the system, started which input the project name and then step over to make the detailed work in each department or discipline in project. The data obtained were then processed by the project control team to provide information of progress project status against the top management. The establishment of information system can be stored and accessed online by all user who have been classified in the system. That information can be integrated between the top management to take a decision against the ongoing project.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.