Open Access
Issue
MATEC Web Conf.
Volume 103, 2017
International Symposium on Civil and Environmental Engineering 2016 (ISCEE 2016)
Article Number 03019
Number of page(s) 9
Section Sustainable Construction, Management and Green Building
DOI https://doi.org/10.1051/matecconf/201710303019
Published online 05 April 2017
  1. D.T. Beeston, A future for cost modelling. Building cost modelling and computers, E FN Spon, 15–24, (1987) [Google Scholar]
  2. H. Zainuddin, CONPLAN. T.I.M.E Research Institution, Department of Survey, Univ. of Salford, UK, (1997) [Google Scholar]
  3. Rochmanhadi, Pengantar dan dasar-dasar teknik penilaian (value engineering), Yayasan, Gema Aproteknika, Semarang, (1992) [Google Scholar]
  4. S. Palmer, A. Kelly, J. Male, Approximate of value engineering in Construction in U.S.A, J. Cons. Eng. Manag, 10(1061), 324–328 (1996) [CrossRef] [Google Scholar]
  5. G.P.A. Landow, A Ruskin quotation?, (2000). Available: http://www.victorianweb.org/authors/ruskin/quotation.html (accessed 20 July 2015) [Google Scholar]
  6. S.A. Pena, W. Parshell, Problem seeking: An architectural programming primer, 4th ed. New York: Wiley, (2001) [Google Scholar]
  7. R.M. Ashworth, A. Skitmore, Accur, in Estim, Chart. Inst. Build., (1983) [Google Scholar]
  8. D. Morton, R. Jagger, Design and the economics of building, Spon Press, (1995) [Google Scholar]
  9. M. Fortune, C. Lees, The relat, perform, of new & trad, cost mod, in strat, advice and clients, R. Inst. Chart. Surv., (1994) [Google Scholar]
  10. A. H. Ashworth, Willis’ practice & procedure quantity surveyors, Black, Scie, Ltd, (2004) [Google Scholar]
  11. A.D. Ibrahim, Effect of change in building, layout on the unit construction, cost of residual build, Quant. Surv., 7(1), (2007) [Google Scholar]
  12. J. Ferry, D. Brandon, P. Ferry, Cost planning of buildings, 7th eds., Blackwell Science, (1999) [Google Scholar]
  13. E. Kouskoulas, V. Koehn, Predes, Cost-Estim, Func, for Build, J. Constr. Div. ASCE, 100(12), 589–604 (1974) [Google Scholar]
  14. A. Ibrahim, applic, of reg, anal, for ass, eff, of var, in build, plan shape on unit cons, cost, Samaru J. Inf. Stud., 4(2) 20–26 (2004) [Google Scholar]
  15. N.G. Flanagan, The relation between construction, price & height, Chart. Surv. Build. Quant. Surv. Q., 5(4), 68–71 (1978) [Google Scholar]
  16. J. Clark, W. Kingston, The skysc: A study in the economic height of modern office, Build, Am. Inst. Steel Constr., New York, (1930) [Google Scholar]
  17. V.K. Skitmore, R.M. Marston, Cost modelling, London: E & FN Spon, (1999) [Google Scholar]
  18. P.S. Ferry, D. Brandon, Cost planning of buildings, Oxford: Blackwell Scie. Public, (1991) [Google Scholar]
  19. D.J. Lowe, M.W. Emsley, Harding, relation between total construction cost & design related variable, J. Financ. Manag. Prop. Constr., 12(1), 11–23 (2007) [CrossRef] [Google Scholar]
  20. M.I. Sabri, Critical succes factor, Konsgres, Bang, Ged, Pada PT.X, Univ. Indo, (2011) [Google Scholar]
  21. Sugiyono, Metode penelitian bisnis (pendekatan kuantitatif, kualitatif, dan R&D), Bandung Alf., (2009) [Google Scholar]
  22. B.C. Basheka, Public procurement skills requirement framework for local government systems in Uganda: Perceptions from professionals, (2010) [Google Scholar]
  23. Sugiyanto, Hand-out meta-analysis, Yogyakarta, UGM, (2004) [Google Scholar]
  24. A.A. Bubshait, A.A. Al-Musaid, Owner involvement in construction projects in Saudi Arabia, J. Manag. Eng., 8(2), 176–185 (1992) [CrossRef] [Google Scholar]
  25. K. Allsopp, An arch, view, Archit. J., 177(4), 29 (1983) [Google Scholar]
  26. M. Coombs, Buildability: A delegate’s view, Archit. J., 177(5), 47 (1983) [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.