International Symposium on Civil and Environmental Engineering 2016 (ISCEE 2016)
|
|
---|---|---|
Article Number | 03010 | |
Number of page(s) | 12 | |
Section | Sustainable Construction, Management and Green Building | |
DOI | https://doi.org/10.1051/matecconf/201710303010 | |
Published online | 05 April 2017 |
- Construction Industry Development Board (CIDB) Malaysia, Construction Industry Transformation Programme (CITP) 2016-2020, No. 1. Malaysia: Construction IndustryDevelopment Board (CIDB) Malaysia, (2015) [Google Scholar]
- G.Ofori, Nature of the construction industry, its needs and its development, A Review of Four Decades of Research, 20(2), 115–135, (2015) [Google Scholar]
- Pook Ah Lek, The dilemma of having foreign workers in Malaysia, Sin Chew Daily, Malaysia, (Sept. 2016) [Google Scholar]
- Department of Malaysia Standard, Temporary construction site workers’ amenities and accommodation - Code of practice MS 2593:2015. Malaysia: Department of Standards Malaysia, (2015) [Google Scholar]
- Lembaga Penyelidikan Undang-undang, Akta Standard-Standard Minimum Perumahan dan Kemudahan Pekerja, 1990 (AKTA 446), Malaysia, (1990) [Google Scholar]
- I.Rozlin and M.HIsmail, Kuarters tangani isu pekerja asing, Sinar Online, (July 15 2015) [Google Scholar]
- Jabatan Kerja Raya Malaysia, Standard Specifications for Building Works 2014. Malaysia: Jabatan Kerja Raya Malaysia, (2014) [Google Scholar]
- Government of South Australia, Guidelines for Workplace Amenities and Accommodation. Australia: WorkCover Corporation, (2003) [Google Scholar]
- B.Y.Jeong, S.Lee and J. D.Lee, Workplace Accidents and Work-related Illnesses of Household Waste Collectors,Saf. Health Work, (2015) [Google Scholar]
- Department of Justice and Community Safety, Australian Code Of Practice Rail Safety Investigation, Australia: Department of Justice & Community Safety, 2, (2010) [Google Scholar]
- Y.Md Junus, Kajian hak pekerja di tapak bina mengikut peruntukan undang-undang, Master Thesis, Universiti Teknologi Malaysia, (2002) [Google Scholar]
- M.Government, Employment Act 1955, April, 1–120, (2012) [Google Scholar]
- A.Hamid and B.Singh, Problems faced by contractors in managing foreign workers on construction sites, 2nd Int. Conference on Construction and Project Management, 15,131–135, (2011) [Google Scholar]
- Jabatan Imigresen Malaysia, Pekerja Asing Separa Mahir dan Kurang Mahir, Jabatan Imigresen News, (2004) [Google Scholar]
- N.Jaffar, A.H.Abdul Tharim and M. N.Shuib, Factors of conflict in construction industry: A literature review, Procedia Engineering, 20, 193–202, (2011) [Google Scholar]
- O. S.Wei, Kesan pengurangan buruh asing dalam industri pembinaan. Kajian kes di Johor Bahru, Master Thesis, Universiti Teknologi Malaysia, Skudai, Malaysia, (2002) [Google Scholar]
- A.M.Ismail, Penggunaan buruh asing dalam industri pembinaan di Johor, (2003) [Google Scholar]
- International Finance Corporation and European Bank for Reconstruction and European Bank for Reconstruction and Development, Workers’ accommodation : processes and standards A guidance note by IFC and the EBRD, European Bank for Reconstruction and Development and International Finance Corporation, London, (2009) [Google Scholar]
- G.Gibbs, Qualitative data analysis: Explorations with NVivo, Philadelphia, USA: Open University Press, (2002) [Google Scholar]
- L.Richards, Handling qualitative data: A practical guide, London: Sage Publications, London, (2005) [Google Scholar]
- C.Grbich, Qualitative data analysis: An introduction, London: SAGE Publication Ltd, London, (2007) [Google Scholar]
- F.Wiltshier, Researching with NVivo 8, Forum: Qualitative Social Research, 12(1), 1–12., (2011) [Google Scholar]
- N.Kariyaa, Z.Yaakobb, M.N.MSairia, H.Mohammadc, S.KYaman and R.Yunus, Investigation of generic house components and their practical assessment during defect liability period ( DLP ) in Malaysia, Int. J. of Engineering, 29(10), (2016) [Google Scholar]
- S.Ariffin, Z.Yaakobb, S.Sulaiman, H.Mohammad, S.KYaman, Factors of economies of scale for abstract, Int. Congress on Technology, Engineering and Science Conf., Kuala Lumpur, Malaysia, (2016) [Google Scholar]
- P.B.Jackson, Qualitative data analysis with Nvivo, Second Edi. London: British Library, (2013) [Google Scholar]
- K.L.Gwet, Computing inter-rater reliability and its variance, British J. of Mathematical and Statistical Psychology,61,29–48, (2008) [Google Scholar]
- M.Graham, A.Milanowski and J.Miller, Measuring and Promoting Inter-Rater Agreement of Teacher and Principal Performance Ratings, (February,2012) [Google Scholar]
- K.Hallgren, Computing inter-rater reliability for observational Data: An overview and tutorial, Tutorials in Quantitative Methods for Psychology, 8(1), 23–34, (2012) [CrossRef] [Google Scholar]
- D.Iacobucci, Factor analysis, J. Consum. Psychol. Spec. Issue Methodol. Stat. Concerns Exerimental. Behaviour Researcher., 10(1&2), 75–82, (2001) [Google Scholar]
- D.G.Freelon, ReCal: Intercoder reliability calculation as a web service, Int. J. Internet Sci., 5(1), 20–33, (2010) [Google Scholar]
- R.E.Stake, Qualitative research: studying how things work, New York: The Guilford Press, London, (2010) [Google Scholar]
- S.E.Stemler, A comparison of consensus, consistency, and measurement approaches to estimating interrater reliability, Pract. Assess. Res. Eval., 9(4), 1–19, (2004) [Google Scholar]
- United States Department of Labor, US OSHA (2016), General environmental control: temporary labor camps, Retrieved on 2016 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS &p_id=9791 [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.