Open Access
Issue |
MATEC Web Conf.
Volume 100, 2017
13th Global Congress on Manufacturing and Management (GCMM 2016)
|
|
---|---|---|
Article Number | 05052 | |
Number of page(s) | 5 | |
Section | Part 5: Management Engineering | |
DOI | https://doi.org/10.1051/matecconf/201710005052 | |
Published online | 08 March 2017 |
- Fricke SE, Shenhar AJ. Managing multiple engineering projects in a manufacturing support environment. HE Transactions on Engineering Management 2000; 47(2) [Google Scholar]
- Jennifer Bates, Planning & Scheduling -Developing Activity Logic. AACE International, Inc. AACE International Recommended Practices, March 26, 2004 [Google Scholar]
- Gregory t. Hogan, Effective Work Breakdown Structures, Mechanical industry press, 2005-07 [Google Scholar]
- Shelly A. Brotherton, Robert T. Fried, Eric S. Norman, Applying the Work Breakdown Structure to the Project Management Lifecycle, PMI Global Congress Proceedings©, 2008 [Google Scholar]
- Wan Li, Chen Xing-pan, Liu Qing-hua, Project management oriented to product-development process in PDM. Computer Integrated Manufacturing Systems [Google Scholar]
- Gui Wei—min, Yang Nai—ding, Jiang Ji—jiao, Enterprise Strategic Project Management, China Soft Science, 2004(5) [Google Scholar]
- Li Zhe, Zhou Huadong, Li Yan, Experience and Inspiration from Foreign Professional S&T Program Management Agency: An Example of DLR-PMA. Forum on Science and Technology in China, 2015(1) [Google Scholar]
- Paul O. Roberts. Supply Chain Management: New Directions for Developing Economies. World Bank Report. 2001. [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.